My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01422
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:37:07 PM
Creation date
10/6/2006 12:22:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150133
Contractor Name
Low Line Ditch Company, The
Contract Type
Loan
Water District
64
County
Logan
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ewCB Constrnction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applioants' engineer( s) and attomey( s). <br /> <br />NAME <br /> <br />Nation Engineering <br /> <br />ADDRESS and PHONE <br />231 Main ST. Suite 306, Fort Morgan, CO 80701. 970-867-2883 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are noW in progress <br />for the proposed projeot. Please submit one oopy of eaoh completed study with this application. _ <br /> <br />Feasibility study being oompleted by Brent Nation of Nation engineering. He will provide the <br /> <br />report by Deoember 15,2002. <br /> <br />9. Estimated oost of the projeot. Please include estimated engineering costs, and estimated <br />construotion costs, if known. <br /> <br />Estimated Engineering Costs: $ 5,000.00 <br /> <br />Estimated Construotion Costs: $100,000.00 <br /> <br />Estimated Total Costs: $105,000.00 <br /> <br />10. Loan amount and tenns you are requesting. <br /> <br />Requested Loan Amount: <br />Tenn (length) ofloan: <br />Interest Rate: <br /> <br />$100,000.00 <br />30 <br />2.75 <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />years (Usually 10,20, or 30 years) <br /> <br />% (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construotion Fund is a revolving fund, it is important that. the project sponsor <br />have the finanoial capaoity to repay any loans made by the CWCB. The following infonnation is' <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial oapacity. It is also <br />requested that the projeot sponsor submit with this application copies of the two most recent annnal <br />reports, financial statements, corporate reports or other current documentation of financial condition <br />and operations. <br /> <br />1. List <\Py existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and addresses <br />oflenders, amounts, due dates and maturity dates. Attach a separate schedule, if needed. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.