My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01413
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:20 AM
Creation date
10/6/2006 12:22:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153302
Contractor Name
Larkspur, Town of
Water District
0
County
Douglas
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />.' <br /> <br />1, Genera 1 <br /> <br />- Map area including topography <br />- Define service area boundaries <br />- Determine design popUlation <br />- Estimate water demands and wastewater loads <br />- Estimate present household costs for water and wastewater <br />- Determine assessed valuation, median family income, <br />maximum feasible debt service, and construction budget limits <br /> <br />2. Wastewater, determine the <br /> <br />- Collection. system preliminary de,;ign including lift stations, <br />forcemains, all gravity lines, manholes, railroad and highway <br />borings, probable economic limi tattons of system. <br />- Treatment alternatives including contract arrangements for <br />treatment in Perry Park facility and consideration of separate <br />wastewater treatment plant. <br /> <br />3. Water. determine the <br /> <br />- Supply alternatives including existing deep wells, new wells, <br />connection to other systems and '~stimates of quality, quantity <br />and treatment required for each source. <br />- Storage quantity, location, type and connection to system. <br />- Distribution, system preliminary Layout including probable <br />economic limitations of system. <br /> <br />4. Costs/Recommendations <br /> <br />- Define the estimated construction costs, annual operation and <br />maintenance costs, and probable contract costs for service by <br />another entity for all feasible alternatives. <br />- Identify the recommended alternative for both wastewater and <br />water based on first cost, annual cost, reliability and health <br />safety. <br /> <br />5. Financial <br /> <br />- Describe the proposed project financing including grant funds, <br />long term loans, and bond issues. <br />Determine possible combinations of property tax levies, user <br />service charges, and water/wastewater rates to generate sufficient <br />annual revenue for debt service, operation and maintenance, and <br />contract requirements. <br /> <br />-2- <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.