My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150074 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150074 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:10 AM
Creation date
10/6/2006 12:21:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150074
Contractor Name
Colorado River Water Conservation District
Contract Type
Grant
Water District
44
County
Routt
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />PROJECT SUMMARY - COLORADO RIVER WATER CONSERVATION <br />DISTRICT - CONTRACT C15007 4 <br /> <br />SECTION 1 -CONTRACTOR INFORMATION <br /> <br />Name: Colorado River Water Conservation District, acting by and through its <br />Colorado River Water Projects Enterprise <br /> <br />Address: P.O. Box 1120, Glenwood Springs, CO 81602 <br /> <br />Phone Number: (970) 945-8522 <br /> <br />Type of Entity: Water conservation district acting by and through its water activity <br />enterprise, formed pursuant to Article 45.1, Title 37, C.R.S. <br /> <br />Section 2 - Project Description <br /> <br />The Project consists of environmental and engineering studies related to the proposed <br />enlargement of Elkhead Reservoir to support project planning, environmental permitting <br />compliance, and institutional arrangements. The enlargement of Elkhead Reservoir is one <br />component of a plan to provide approximately 7,000 acre-feet of water from new and existing <br />sources for four endangered fish species in the Yampa River basin. <br /> <br />SECTION 3 - TIME FOR PERFORMANCE <br /> <br />Project Beginning: Upon execution by the State Controller or his designee. <br /> <br />Project Finish: Three (3) years from the execution date of this contract. <br /> <br />SECTION 4 - DISBURSEMENT SCHEDULE <br /> <br />1. Disbursement of funds. The STATE shall disburse funds to the CONTRACTOR to pay for the <br />. _ _costs associclted ~~_t~~P~oje~_u2_to_~..!!1axil11~I11_~~~lJ..n~_o.~ $50~,99~_~n_ the_ following <br />manner: <br /> <br />a. Statement of costs. During the completion of the tasks, the CONTRACTOR shall prepare <br />statements of the costs of the Project and submit said statements to the STATE for payment. <br />Each statement shall indicate the tasks that have been performed and the percentage <br />completion of each task by task category as specified in the Study Plan, and shall include <br />all supporting technical documents as specified in the Study Plan. <br /> <br />b. Payment of statements. Upon receipt and approval by the STATE of each such statement of <br />costs, the STATE will, within 30 days from the approval of such statement, pay to the <br />CONTRACTOR the amount of the statement or such portion thereof as has been approved by <br />the STATE. <br /> <br />SECTION 5 - REPRESENTATIVES <br /> <br />Contractor Representative: <br /> <br />CWeB Representative: <br /> <br />Dan Birch <br />Mike Serlet <br /> <br />Appendix 1 to Contract C150074 <br />
The URL can be used to link to this page
Your browser does not support the video tag.