Laserfiche WebLink
<br />'. <br /> <br />, . <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />Appendix 2 - Study Plan <br />Elkhead Reservoir Enlargement <br /> <br />Estimated Cost To Address Permitting Issues and Draft Environmental Documentation <br />(Environmental and engineering issues to be identified in above work and NEP A scoping) <br /> <br />Administrative Services <br />Environmental Studies <br />Engineering Studies <br /> <br />$189,000 <br />180,000 <br />61,000 <br /> <br />Subtotal <br />Contingency at 20% <br /> <br />$ 430,000 <br />86,000 <br /> <br />Estimated Cost <br /> <br />$516,000 <br /> <br />TOTAL ESTIMATED PROJECT COST THROUGH PERMITTING: <br /> <br />$1,103,840 <br /> <br />3 <br />