My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:27:04 AM
Creation date
10/6/2006 12:21:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB or in any other manner, except for any existing Iien(s) identified in Section 5 <br />(Schedule of Existing Debt) of the Project Summary, which sets forth the position <br />of the lien created by this contract in relation to any existing lien(s). Documentation <br />establishing the relative priorities of said liens, if necessary, is attached to the <br />Project Summary and incorporated herein. <br /> <br />10. Change of Ownership of Water Shares During Term of Contract. If the interest <br />rate for this loan is based on the CWCB's agricultural or blended agricultural and <br />municipal and/or commercial and/or industrial rates, the BORROWER agrees to notify <br />the CWCB of any change of the ownership of the water rights represented by its <br />shares from irrigation to municipal or commercial or industrial use. The interest rate <br />shall be revised when said change in ownership would increase the original interest <br />rate by 0.5% or more. The parties shall amend this contract, including a revised <br />promissory note, to effect said change in interest rate. <br /> <br />11. Remedies For Default. Upon default in the payments to be made by the BORROWER <br />under this contract, or default in the performance of any covenant or agreement <br />contained herein, the CWCB, at its option, may: <br /> <br />a. suspend this contract and withhold further loan disbursements pending corrective <br />action by the BORROWER, and if the BORROWER does not cure the default as <br />provided for below, permanently cease loan disbursements and deem the PROJECT <br />substantially complete; <br /> <br />b. declare the entire principal amount, accrued interest, and late charges, if any, then <br />outstanding immediately due and payahlA; <br /> <br />c. exercise its rights under any appendices to this contract, including, but not limited to, <br />the Promissory Note, Security Agreement, and/or any instrument securing collateral; <br />and/or <br /> <br />d. take any other appropriate action. <br /> <br />The CWCB shall provide written notice to the BORROWER of any such default and shall <br />give the BORROWER an opportunity to cure within thirty (30) days of receipt of such <br />notice. All remedies described herein may be simultaneously or selectively and <br />successively enforced. The CWCB may enforce the provisions of this contract at its <br />option without regard to prior waivers of previous defaults by the BORROWER, through <br />judicial proceedings to require specific performance of this contract, or by such other <br />proceedings in law or equity as may be deemed necessary by the CWCS to ensure <br />compliance with provisions of this contract and the laws and regulations under which <br />this contract is executed. The CWCS's exercise of any or all of the remedies <br />described herein shall not relieve the SORROWER of any of its duties and obligations <br />under this contract. <br /> <br />11. BORROWER'S Indemnification Of The CWCB. The BORROWER agrees to indemnify and <br />hold the ewcs harmless from any liability incurred by the CWCS as a result of the <br />eWcs's interest in the PROJECT facilities and any other property identified in Section 6 <br />(Collateral) of the Project Summary. <br /> <br />12. Operation of PROJECT. The BORROWER shall, without expense or legal liability to the <br />CWeB, manage, operate, and maintain the PROJECT continuously in an efficient and <br /> <br />Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.