My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:27:04 AM
Creation date
10/6/2006 12:21:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Kem Reservoir and Ditch Company <br />September 1 1-12, 2002 <br /> <br />Agenda Item 12a, <br />(Updated September 16, 2002) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Kern Reservoir and Ditch Company County: Weld <br /> <br />Project Name: <br /> <br />Kern Reservoir <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Cache La Poudre River <br /> <br />Total Project Cost: $5,100,000 <br /> <br />Funding Sources: CWCB <br /> <br />Type of Borrower: Municipal/Commercial <br /> <br />Median Household Income: High <br /> <br />CWCB Small Project Loan: $1,0000,000 Blended Interest Rate: 5.1% Term: 30 years <br /> <br />CWCB Grant: $5,000 Reservoir Volume: 2,600 acre-feet <br /> <br />The Kern Reservoir and Ditch Company operates the Kern Reservoir for storage of irrigation <br />water, as an equalizer reservoir for the Greeley Number 2 Ditch, and for recreation. The reservoir <br />is located in the Town of Windsor, about 45 miles north of Denver, and receives water from the <br />Cache La Poudre River. The reservoir has been in use for approximately 100 years, during which <br />time it has become silted in to a capacity of 1,100 acre-feet. The Company wants to dredge out <br />the reservoir to restore the original capacity of 1,800 acre-feet and to provide additional storage <br />for the 100-year flood. Work would start in winter 2002, and take 3 years to complete. The Kern <br />Reservoir and Ditch Company is a mutual ditch and reservoir compan and a non. rofit <br />. . , a e 0 0 ora o. ocky Mountain Consultants, Inc., has <br />completed the feasibility study. Proposed funding for the project consists of a CWCB Small <br />Project Loan for $1,000,000. The Company plans to apply for a standard CWCB loan to help <br />finance the remainder-of the project. <br /> <br /> <br />'-.' J.lL J <br />Project Location <br /> <br />, <br />. <br /> <br />" . <br /> <br />Location Map <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.