Laserfiche WebLink
<br />Kem Reservoir and Ditch Company <br />September 18, 2002 <br /> <br />Page 2 <br /> <br />3. You must adhere to the CWCB Desiqn and Construction Administration Procedures. Tim <br />Feehan will contact you regarding the CWCB requirements conceming project bidding, design, <br />and construction. Tim will make construction inspections, which will be the basis of the pay <br />estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />S~~ <br /> <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Kern 902memo <br /> <br />cc (wIAttachment): <br /> <br />Mr. Eric Wilkinson, Colorado Water ConselVation Board <br />CWCB Seclion B Staff <br />Linda Bassi. AGO <br />Chrono File <br /> <br />c: wp51\Proj-NewlKern 9021tr <br />