My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:27:04 AM
Creation date
10/6/2006 12:21:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROMISSORY NOTE <br /> <br />Date: December 1, 2002 <br /> <br />Borrower: Kem Reservoir and Ditch Company <br /> <br />Principal Amount: $1,000,000.00 <br /> <br />Interest Rate: 5.1 % per annum <br /> <br />Term of Repayment: 30 years <br /> <br />Loan Contract No.: C150112, dated December 1, 2002 <br /> <br />Loan Payment: $65,794.84 <br /> <br />Payment Initiation Date *: N. /1"""'1,.__ I. 2" 0.:3 <br /> <br />Maturity Date*: III" Ih.......b.._ I) Z 0 -3;3 <br /> <br />. These two fields are filled in after the proiect has been substantially completed <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to <br />the LOAN CONTRACT. <br /> <br />2. Principal and interest shall be payable in equal loan Payments, with the first payment due and <br />payable one year from the date the CWCB determines that the project is substantiall <br />com lete Pa , . nnclpa , Interest, and late <br />charges, if any, have been paid in full, with all such principal, interest, and late charges, <br />required to be paid on or before the Maturity Date. <br /> <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203, <br /> <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the <br />CWCB does not receive the annual payment within 15 calendar days of the due date. <br /> <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br /> <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount <br /> <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are <br />evidenced by a Security Agreement, and Deed of Trust of even date and amount and cover <br />certain revenues, real property, water rights and/or accounts of the BORROWER. The LOAN <br />CONTRACT, Security Agreement, and Deed of Trust grant additional rights to the CWCB, <br />including the right to accelerate the maturity of this Note in certain events. <br /> <br />Appendix 2 to Loan Contract C150112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.