Laserfiche WebLink
<br />PROJECT SUMMARY - KERN RESERVOIR - CONTRACT NO. C150112 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Kern Reservoir and Ditch Company <br />, ' , <br />Address: 2319 101h Street <br />Windsor, CO 80550 <br />Wayne Miller, President <br />970-686-7476(W) or 7331 (H) <br />Colorado nonprofit corporation <br /> <br />Contact: <br />Phone Number: <br />Type of Entity: <br /> <br />SECTION 2 - PROJECT DesCRIPTION <br /> <br />A. ,Description of PROJECT: The BORROWER operates the Kern Reservoir for storage " <br />of irrigation water, as an equalizer reservoir for the Greeley Number 2 Ditch, and <br />for recreation. The reservoir is located in the Town of Windsor, and receives <br />water from the Cache La Poudre River. The reservoir has been in use for <br />approximately 100 years during which time it has become silted in to a capacity of <br />1,100 acre feet. The Borrower wants to dredge out the reservoir to restore the <br />original capacity of 1,800 acre-feet and to provide additional storage for the 100- <br />year flood. The total project cost is estimated at $5,100,000 and iNork is planned <br />to start in winter 2002 Rnn t~ke three years to complete, <br /> <br />B. Description of Feasibility Study: Rocky Mountain Consultants, Inc. completed the <br />feasibility study report entitled Feasibility Study - Kern Reservoir Enlargement, <br />dated August 2002, which is incorporated herein by reference. Based upon its <br />review of said report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br /> <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Small Proiect Loan: This loan is made pursuant to the provISions of Sections <br />37.60-119 and 37-60-120. C.R.S., which authorizes, the CWCB to loan money for water <br />projects for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. ' <br /> <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCS to make loans of up to <br />$1,000,000 from the CWCS's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. ' , ' ' <br /> <br />SECTION 4 . BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />A. At its September 2002 meeting, the CWCB approved a Small Project Loan out of <br />the Construction Fund to the BORROWER in an amount up to $1,000,000, not to <br />exceed 75% of the cost of the PROJECT, at an interest rate of 5.10% per annum for a <br />repayment term of 30 years or 4.80% for a repayment term of 20 years, at the <br /> <br />Appendix 1 to Loan Contract C150112 <br />