My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 10:27:04 AM
Creation date
10/6/2006 12:21:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT SUMMARY - KERN RESERVOIR - CONTRACT NO. C150112 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Kern Reservoir and Ditch Company <br />, ' , <br />Address: 2319 101h Street <br />Windsor, CO 80550 <br />Wayne Miller, President <br />970-686-7476(W) or 7331 (H) <br />Colorado nonprofit corporation <br /> <br />Contact: <br />Phone Number: <br />Type of Entity: <br /> <br />SECTION 2 - PROJECT DesCRIPTION <br /> <br />A. ,Description of PROJECT: The BORROWER operates the Kern Reservoir for storage " <br />of irrigation water, as an equalizer reservoir for the Greeley Number 2 Ditch, and <br />for recreation. The reservoir is located in the Town of Windsor, and receives <br />water from the Cache La Poudre River. The reservoir has been in use for <br />approximately 100 years during which time it has become silted in to a capacity of <br />1,100 acre feet. The Borrower wants to dredge out the reservoir to restore the <br />original capacity of 1,800 acre-feet and to provide additional storage for the 100- <br />year flood. The total project cost is estimated at $5,100,000 and iNork is planned <br />to start in winter 2002 Rnn t~ke three years to complete, <br /> <br />B. Description of Feasibility Study: Rocky Mountain Consultants, Inc. completed the <br />feasibility study report entitled Feasibility Study - Kern Reservoir Enlargement, <br />dated August 2002, which is incorporated herein by reference. Based upon its <br />review of said report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br /> <br />SECTION 3 - CWCB's AUTHORITY <br /> <br />Small Proiect Loan: This loan is made pursuant to the provISions of Sections <br />37.60-119 and 37-60-120. C.R.S., which authorizes, the CWCB to loan money for water <br />projects for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. ' <br /> <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCS to make loans of up to <br />$1,000,000 from the CWCS's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. ' , ' ' <br /> <br />SECTION 4 . BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />A. At its September 2002 meeting, the CWCB approved a Small Project Loan out of <br />the Construction Fund to the BORROWER in an amount up to $1,000,000, not to <br />exceed 75% of the cost of the PROJECT, at an interest rate of 5.10% per annum for a <br />repayment term of 30 years or 4.80% for a repayment term of 20 years, at the <br /> <br />Appendix 1 to Loan Contract C150112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.