My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01363
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:00 AM
Creation date
10/6/2006 12:21:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153749
Contractor Name
DeWeese-Dye Ditch and Reservoir Company
Contract Type
Loan
Water District
12
County
Custer
Bill Number
FSL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: 97 PDA 01031:; <br /> <br />$ 17,450 <br /> <br />( Io,if.? -; <br />LOAN CONTRACT & PROMISSORY NOTE <br />FOR A FEASIBILITY REPORT <br /> <br />THIS CONTRACT, made this 5.tJi-, day of FbbYI./.lPYl/ 1997, <br />by and between the State of Colorado for the use ilnd benefit of the DeparllTl€nt of Natural Resources, <br />Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, AND DEWEESE-DYE <br />DrrCH AND RESERVOIR COMPANY, hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered bala(lce thereof remains available for payment in Fund <br />Number 424, Organization YYYV, Appropriation FSL, GBL D749, Program WTRC, Object Code <br />5110, Reporting Category 3749, Contract Encumbrance Number C153749. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and with appropriate <br />agencies. <br /> <br />C. Pursuant to the provisions of ~~ 37-60-119 and 37-60-122(1)(c), C.R.S. (1990 and Supp. 1996), the <br />STATE is authorized to loan money for the constltlction of certain water projects for the benefit of the <br />people of the State of Colorado, and to expend monies for feasibility studies on such projects, <br />provided that the borrower assures repayment of that money. <br /> <br />D. The BORROWER has applied to the STATE for a loan to conduct a feasibility study to include an <br />assessment of the DeWeese Dam and an analy5is of altematives for any rehabilitation work that may <br />be required, hereinafter referred to as STUDY, at il cost of approximately $44,900. <br /> <br />E. The BORROWER is a duly constituted Colorado ditch and reservoir corporation formed pursuant to ~~ <br />7-42-101 et sea. and 7-40-101 et sea., C.R.S., located in Custer County, State of Colorado. <br /> <br />F. At its November 25-26, 1996, meeting, the CWeB approved a loan to the BORROWER in an amount <br />not to exceed $17,450 (50% of the cost of the SrUDY) at an interest rate of 3.25% per annum, and for <br />a duration of 10 years. <br /> <br />G. The STATE now desires, by this contract, to loan money to the BORROWER for this STUDY upon <br />mutually agreeable terms and conditions. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained, the <br />parties agree as follows <br /> <br />1. Preparation Of Feasibility Report. The BORROWER shall have a feasibility report prepared on the <br />RROJECT. The State has approved a scope of study for the Feasibility Report prepared by the <br />BORROWER. The scope of study is attached hereto as Appendix A and incorporated herein. <br /> <br />Feasibility Study Loan Contract <br /> <br />Page 1 of P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.