Laserfiche WebLink
<br />documentation of renewals of said insurance. <br /> <br />14. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 7) of the Project Summary. <br />B. PROJECT PROVISIONS <br /> <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 8), of the Project Summary. <br /> <br />2. Eligible Expenses. The PROJECT expenses for which the 'BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 9) of the Project <br />Summary. Loan Disbursements, The CWCB shall disburse loan funds in <br />accordance with the Disbursement Schedule (Section 10) of the Project Summary. <br /> <br />3. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within the time specified in Time for Performance (Section 11) of <br />the Project Summary. <br /> <br />4. Indemnification By The Construction Firm.' The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the CWCB and the <br />BORROWER against all liability and loss, and against all claims and actions based upon <br />or arising out of damage or injury, including death, to persons or property, caused by <br />any acts or omissions of those parties or sustained in connection with the performance <br />of any contract related to the PROJECT or by conditions created thereby, or based upon <br />any violation of any statute, ordinance, or regulation, and the defense of any such <br />claims or actions. <br /> <br />5. Liability Insurance During Construction. During construction of the PROJECT, the <br />BORROWER shall require the construction firm(s) and any subcontractors to maintain the <br />following insurance coverage in the limits shown during the term of their contracts for <br />the construction of the PROJECT. The BORROWER shall provide the CWeB with an Acord <br />Form 27 evidencing said insurance prior to commencement of construction, maintained <br />until construction is complete, and shall provide the CWCB with documentation of <br />renewals of said insurance. No payments shall be made to the BORROWER unless all <br />insurance certificates are current. <br /> <br />a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, and vandalism in an amount equal to the completed value of the <br />PROJECT. ' <br /> <br />b. Worker's compensation and employer's li8bility insurance in the required statutory <br />amounts. . <br />c. Automobile liability insurance that includes coverage for all owned, non-owned and <br />hired vehicles with minimum limits of $1,000,000 combined single limit for bodily <br />injury and property damage. <br />d. Commercial general liability insurance with minimum limits of $1,000,000 combined <br />single limit for each occurrence and $2,000,000 general aggregate. This insurance' <br />coverage shall include products/completed operations and bodily injury/property <br /> <br />Page 4 of 8 <br />