My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01276
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:28:07 AM
Creation date
10/6/2006 12:19:56 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AMENDHENT #l <br />PROJECT <br />CONTRACT <br /> <br />~. fl 'j 17e:, 'I ! <br />Ut-.f H::N r OR AGENCY .'l/U.\tBl::R <br />34-04-00 <br />co:'>! rRACT RO~P~(; NlJ\tBER <br />'i\'(f,/ru <br />$12,700 Additional <br /> <br />Form 6-AC~2A CR ,S/8's1 <br />" W/FRPB <br />Lone Cabin Dam <br /> <br />THIS CONTRACT. made ,)lis :J? t'Z-day of <br />Slale of Colorado for lhe u~e an~ benefic of loe Depar! enl of '1 <br />(Colorado Water Conservation Board), <br />hereinaher rf'ferred 10 as rhe SlalC', and '2 the Lone Cabin Ditch and Reservoir <br />Company, 4236 N. Road, paonia, CO 81428, <br />hep~inaf!er referred to as (he cO':ltractor /Contractor, and the North Fork Water Conservaric <br />D~str~ct, a duly const~tuted water conservancy district, sponsoring agency. Y <br />WHEREAS. authority exislS in the law and funds have been budgeled. appropriated and otherwise made <br />available and a sufficienl unencumbered balance thereof remains available for payment in Fund ~umber 4008 <br />G/L Account Numbtr5369X . COlUmct Encumbrance NumberCl535l7 ; and ' <br />ABL Account No. 13690, Org. Unit 77-77-777, <br />.WHEREAS. re4uired appruval. clearance and coordinaliun has been accomplished from and with appropriate <br />agenclcs: and <br /> <br />198 ~ . bl! and betwcen the <br />Natural Resources <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract dated JUly 13. 1988. contract encumbrance number <br />C-153517 (hereinafter the "Original Contract"); and <br /> <br />WHEREAS. the original loan of Eighty Thousand Dollars <br />($80.000> made to the Contractor for the repairs of the Lone <br />Cabin Dam was insufficient; and <br /> <br />WHEREAS. pur$uant to Senate Bill No. 85. Fifty-Seventh <br />General Assembly of the State of Colorado. duly enacted into <br />law. the State h~S been authorized to increase the loan amount <br />to Ninety-Two Thousand Seven Hundred Dollars ($92.700), and <br />also to increase the time of repayment from twenty-eight (28) <br />to Forty (40) years. <br /> <br />NOW THEREFOR~. in consideration of the mutual and dependent <br />covenants herein contained. it is hereby agreed as follows: <br /> <br />1. This con~ract amendment is a supplement to the Original <br />Contract. Attach~ent A. which is by this reference incorporated <br />and made a part hereof: and all terms. conditions and <br />provisions thereOf. unless specifically modified herein. are to <br />apply to this contract amendment as though they were expressly <br />rewritten. incorporated. and included herein. <br /> <br />2. Paragrapns B.ll.. B.12.. 0.1. and J. shall be amended <br />to read as follo~s: <br />/' - 7 <br />B,11. Repay to the Sta te the tota 1 (p~ inc i pa l' sum of Two <br />Hundred sixteen Thousand One Hundred Two Dollars and <br />Forty Cents ($216.102.40). which includes the <br />project loan amount and the feasibility report <br />amount. together with interest at the rate of five <br />percent (5'> per annum. said repayment to be made in <br />const~nt annual installments of Five Thousand Four <br />Hundred Two Dollars and Fifty-Six Cents ($5.402.56) <br />each. for forty (40) years. as shown in Attachment <br />B. attached hereto and incorporated by reference <br />herein. which first installment shall be due and <br />payable on the first day of the month next <br />succeeding the month in which the State determines <br />that the project has been substantially completed. <br />and yearly thereafter until the entire principal sum <br />shall have been paid. However. in the event the <br />Contractor does not draw funds commencing on the <br />date specified in paragraph D.l.a. below. the <br />obligation to repay shall be postponed for the same <br />number of months as the Contractor delays in drawing <br />funds. Said installment payments shall be made <br />payable to the ColoradO Water Conservation Board. <br />payabl~ at the offices of said Board in Denver. <br />Colorado. The Contractor pledges its full faith and <br />credit in support of this Obligation and warrants <br /> <br />J95-5lO1-1014 <br /> <br />Pa~e I of -.2.. pa~cs <br /> <br />0124E* <br />
The URL can be used to link to this page
Your browser does not support the video tag.