My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153795 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153795 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:49:25 PM
Creation date
10/6/2006 12:19:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153795
Contractor Name
Farmers Independent Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"" <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built.. <br />drawings of the PROJECT to the CWCS staff, and, if required by 9 37-87-105, C.R.S. <br />(1997), the BORROWER shall provide the same drawings to the State Engineer's Office for <br />approval and filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT. <br /> <br />2. Time For PROJECT Completion. The BORROWER recognizes that time is of the essence in <br />the performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />commence with construction in order to complete the PROJECT no later than two (2) years <br />from the date of this contract. The time for completion of the PROJECT may be extended <br />subject to the approval of the STATE. The BORROWER must provide, in writing, documented <br />justification for any request for extension sixty (60) days prior to the end of the period for <br />completion. <br /> <br />3. Indemnification By The CONSTRUCTION FIRM. The BORROWER shall require all <br />CONSTRUCTION FIRMS and their subcontractors to indemnify the STATE and the BORROWER <br />against all liability and loss, and against all claims and actions based upon or arising out of <br />damage or injury, including death, to persons or property, caused by any acts or omissions of <br />those parties or sustained in connection with the performance of any contract related to the <br />PROJECT or by conditions created thereby, or based upon any violation of any statute, <br />ordinance, or regulation, and the defense of any such claims or actions. <br /> <br />4. Liability Insurance During Construction. The BORROWER shall require the CONSTRUCTION <br />FIRM and its subcontractors to maintain during the term of their contracts for construction of <br />the PROJECT the following insurance with a company that is satisfactory to the STATE: <br /> <br />a. Worker's compensation and employer's liability insurance in the required statutory <br />amounts. <br /> <br />b. Automobile liability insurance which includes coverage for all owned, non-owned and <br />hired vehicles with minimum limits of $1,000,000 combined single limit for bodily injury <br />and property damage. <br /> <br />c, Commercial general liability insurance with minimum limits of $1 ,000,000 combined single <br />limit for each occurrence and $2,000,000 general aggregate. This insurance coverage <br />shall include products/completed operations and personal injury. <br /> <br />d, Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, vandalism, and flood in an amount equal to the completed value of the <br />PROJECT. <br /> <br />Said general liability insurance shall name the BORROWER and the STATE as additional <br />insured. An additional insured endorsement and a current copy of a certificate of said liability <br /> <br />The Farmers Independent Ditch Company <br /> <br />Page 3 of 14 <br /> <br />Loan Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.