My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01092
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:06:07 AM
Creation date
10/6/2006 12:17:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153625
Contractor Name
Dames and Moore
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT C <br />SECTION 11 <br />WORK PRODUCTS <br /> <br />. <br /> <br />Each task will have a report as its product, which will present the results of each task <br />with a minimum of preamble. These will be submitted initially in draft form. Final versions <br />of these reports will be submitted at the end of the study. <br /> <br />A summary report will be produced upon.completion of Tasks 1 through 8 which will <br />be a self-contained document summarizing all results and providing sufficient discussion to <br />support the conclusions and recommendations. <br /> <br />A draft Feasibility Study Report will be delivered by December 1, 1992, which will <br />conform to the !MAP - Feasibility Study Guidelines. Following receipt of comments, this <br />report will be issued in final form by December 31, 1992. <br /> <br />The numbers of report copies to be submitted will be as specified in the RFP which <br />are as follows: ._ <br /> <br />· Twenty (20) copies of each Monthly Progress Report. <br /> <br />· Twenty (20) copies of the Draft Task Report and work products as each task is <br />completed. <br /> <br />· Forty (40) copies of a Progress Report summarizing the results of Tasks 1 through <br />8 by November 2, 1992. <br /> <br />· Twenty (20) copies of a Draft Feasibility Study Report by December 1, 1992 with <br />information for potential inclusion in the CWCB's annual appropriations bill for <br />1993. <br /> <br />· Twenty (20) copies of the Final Task Reports and work productS by December 31, <br />1992. <br /> <br />· Forty (40) printed copies of the Final Feasibility Study Report by December 31, <br />1992. <br /> <br />· One camera ready original of the final report by December 31, 1992. <br /> <br />· One electronic copy of the final report in WordPerfect 5.1 on a 3lh-inch floppy <br />disk. <br /> <br />In addition to these formal reports, informal Progress Reports will be prepared at the <br />end of each momh. These reports will describe: <br /> <br />· Work accomplished during that month. <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.