My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01071
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:11 AM
Creation date
10/6/2006 12:17:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153594
Contractor Name
Handy Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1'1 r IIi <br /> <br />1.ll \l,I."ll "l,'lllll( <br /> <br />Handy (\'/elclIJ <br />. . Dum l'Jcst (No.1) <br />\~/PB <br /> <br />34 04 00 <br />CONI'R, KO '[INti NIIMnl-"l~ <br />L' :J'.... <br />$6,000 <br /> <br />FE^SIBILITY REPORT <br />CONTRACT <br /> <br />THIS CONTRACT. made- l~is ,;;, l"./day of t'i'> /. I~._.t 19 9-.!, by and belween the <br />Slale.- of Coloradu fur lhe u~c and henefil IIf IRe l)el"arlment of ., Na tural Resources <br />(Colorado Water Conservation Board) t <br />he-re-inaflrr ",ferred 10 as the Slate. and'2 the Handy Di tell Company t <br />P. O. Box 1079, Berthoud, CO 80513, <br />hereinafler refeHe-d to as Ihe conlraclur IContractor. <br /> <br />, <br />WHEREAS. lluthority Uisb in lhe- Law and Funds have be-en budgeted. appropriated and othe-twise made <br />..nib hie and _a sufficient unt"llcumbered bal3nce thereof remains av,il~b.l~ .fo,r. payment in Fund "'umber 4008 , <br />G/l Accnunt Number 5252X. COlltract Encumbranct" Numbt"..:" ./In'-.\(; and <br />ABL Account No. .1_?_5~~, Org. Unit 77-~7-777, <br />WHEREAS. re(luirl.'d appwv;al. dearam'e :md conrdinalion ha~ heen accomplished (rom and wilh appropriale <br />"encles: and <br /> <br />WHEREAS. pursuant to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as 'amended. the State is authorized <br />to construct certain water projects for the benefit of the <br />people of the State of Colorado; and <br /> <br />WHEREAS. the lIandy Ditch Company has made application to <br />the State for the improvement of its existing facility, such <br />improvement of the facility is hereinafter sometimes referred <br />to as the pro ject; and <br /> <br />WHEREAS. the Contractor is an incorporated ditch company <br />within the State ot Colorado; <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of 'improving the facilities of the <br />Handy (Welch) Dam West (No.1) in accordance with a proposal <br />for a project feasibility report prepared by the conSUlting <br />engineering firm of Rocky Mountain Consultants. Inc. (the <br />Consultant), and approved by the State, received September 27. <br />1990. which proposal is attached hereto as Appendix A and made <br />a part of this contract. <br /> <br />2. Five (5) copies ot the tinal report called tor in this <br />contract shall be turnished to the State not later than sixty <br />(60) days atter the date of this contract, unless such time is <br />extended by mutual agreement of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor. the <br />State shall pay to the Contractor the sum of Six Thousand <br />Dollars ($6.000) in the manner fOllowing: <br /> <br />a. Sixty percent (60\), to wit. Three Thousand Six Hundred <br />Dollars ($3.600) of the total amount due in two (2) monthly <br />installments of One Thousand Eight Hundred Dollars ($1,800) <br />each. commencing Thirty (30) days after the date of this <br />contract. <br /> <br />b. The remaining forty percent (40\). to wit, Two <br />Thousand Four Hundred Dollars ($2.400) within torty (40) <br />days fOllowing receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Twelve Thousand Dollar6 <br />($12.000) and the Contractor shall pay the sum of six Thousand <br />Dollars ($6.000) as agreed to by letter dated September 28, <br />1990. which is hereby attached and made a part of this contract <br />as Appendix D: and in no event shall this payment be the <br />liability of the State ot Colorado. <br /> <br />J9H}()'}o1014 <br /> <br />Pailc I of.....L. pa~es <br />EXHIBIT B <br /> <br />3330E' <br />
The URL can be used to link to this page
Your browser does not support the video tag.