<br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRk~ PROCEDURES <br /> <br />1. Board approval of en9 ineerin9 firm and eng ineering <br />agreement between engineering firm and project sponsor a <br /> <br />2. preparation Of detailed plans and specifications for <br />author ized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs mUst also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid openin9 for construction. <br /> <br />S. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />e. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspect.iot:'&._ <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and fil ing . <br /> <br />EXHIBIT E <br /> <br />102 <br />sehedl a <br />