My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01006
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 11:20:37 AM
Creation date
10/6/2006 12:16:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
forth in Additional Contract Requirement (Section 6) of the Project Summary. <br />8. PROJECT PROVISIONS <br />1. Construction Fund Program Procedures. During the completion of the PRO.IecT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 7) of the Project Summary. <br />2. Eligible Expenses. The PRO.lecr expenses for which the BoRROweR is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 8) of the Project <br />Summary. <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 9) of the Project Summary. <br />4. Time for Performance. The BoRROwert recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BoRROweR shall <br />complete the PROeecr within the time specified in Time for Performance (Section 10) of <br />the Project Summary. <br />5. indemnification 8y The Construction Firm. The BORROWER shalf require all <br />Construction Firms and their subcontractors to indemnify the STATe and the BoRROwER <br />against all liability and loss, and against all claims and actions based upon or arising <br />out of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PRO�ecT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br />6. Liability Insurance During Construction. During construction Of th@ PROJECT the <br />BoRROweR shall require the construction firm(s) and any subcontractors to maintain the <br />following insurance coverage in the limits shown during the term of their contracts for <br />the construction of the PRO�ecT. The BoRROwER shall provide the CWCB with an <br />Acord Form 27 evidencing said insurance prior to commencement of construction, <br />maintained until construction is complete, and shall provide the CWCB with <br />documentation of renewals of said insurance. No payments shall be made to the <br />BoRROweR unless all insurance certificates are current. <br />a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, and vandalism in an amount equal to the completed value of the <br />PROJECT. <br />b. Worker's compensation and employer's liability insurance in the required statutory <br />amounts. <br />c. Automobile liability insurance that includes coverage for all owned, non-owned and <br />hired vehicles with minimum limits of $1,000,000 combined single limit for bodily <br />injury and property damage. <br />d. Commercial general liability insurance with minimum limits of $1,000,000 combined <br />single limit for each occurrence and $2,000,000 general aggregate. This insurance <br />coverage shall inciude products/completed operations and bodily injury/property <br />damage. <br />C. GENERAL PROVISIONS <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.