Laserfiche WebLink
BORROWER: SILT WCD <br />Contract No. C150135 <br />Agency Name: Water Conservation Board <br />Agency Number PDA <br />Routing Number: 05 PDA � �!� � 3 <br />LOAN CONTRACT AMENDMENT NO. 1 <br />(STANDARD CONTRACT — WAIVER #160 — APPROVED NOVEMBER 1 O; 2003) <br />This Amendment, made this October 1, 2004, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado <br />Water Conservation Board ("CWCB"), and Silt Water Conservancy District acting by and <br />through the Silt Water Conservancy District Water Activity Enterprise, P. O. Box 8, Silt, <br />Colorado 84652 ( "BORROWER" oC "CONTRACTOR"). <br />FACTUAL RECITALS <br />A. Authority exists in the law, and funds have `been budgeted, appropriated, and otherwise <br />made available for payment in Contract Encumbrance Number C150135, Fund Number <br />424, Appropriation Code MC3, Organization YYYY, GBL S135, Program WTRC, Object <br />Code 5560, Reporting Category 0135. <br />B. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. , <br />C. The CWCB and the BoRROwER entered into Contract Encumbrance Number G150135, <br />dated June 1, 2003, (" ORIGINAL CONTRACT" incorporated herein by reference, wherein the <br />CWCB agreed to loan money in the total amount up to $490,860, and the BoRROwER <br />agreed to repay the loan in accordance with the terms of the ORi�itva� CotvTRacr. <br />D. The Project consists of replacing the transformer for the pumping plant that delivers <br />approximately 4,000 acre-feet per year from the Colorado River to the Pump Canal, and <br />the replacement must be coordinated by Excel Energy who has postponed its <br />transmission line voltage upgrade until 2007. The BoRROwER therefore requests that <br />the time for completion be extended to 2008. <br />E. The CWCB has reviewed the BORROWER request and has agreed to amend this <br />contract extend the time for completion of the project to December 31, 2008. <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORi�iNa� CoNTwacT consists of the payments <br />that shall be made pursuant to this Amendment and the ORi�iNa� CoNrRacr and the <br />promises and agreements herein set forth. <br />2. It is expressly agreed by the parties that this Amendment is supplemental to the ORi�iNa� <br />CoNTR,o,cT and all terms, conditions, and provisions thereof, unless specifically modified <br />herein, are to apply to this Amendment as though they were expressly rewritten, <br />incorporated, and included herein. <br />3. The CWCB agrees that it shall extend the time for completion Of th2 BORROWER <br />Project to December 31, 2008. <br />4. The parties agree that the ORi�itva� CoNrRacr, is and shall be modified, altered, and <br />changed in the foflowing respects only: <br />Page 1 of 2 <br />