Laserfiche WebLink
<br />, . <br />i/) <br /> <br />EXHIBIT 1 <br /> <br />Description of the Southern Water Supply Project <br />Fort Lupton/Hudson Pipeline <br /> <br />The Southern Water Supply Project - Fort Lupton/Hudson Pipeline (the "Pipeline") consists of <br />approximately 29 miles of 28-inch diameter and 22-inch diameter pressurized, buried steel pipeline <br />and various valve and vent facilities. The Pipeline will convey water from the Carter Lake to <br />Broomfield Pipeline portion of the Southern Water Supply Project to Participant delivery points <br />shown on the attached map. <br /> <br />The route for the 29-mile buried pipeline begins at the Carter Lake to Broomfield Pipeline <br />connection northwest of the City of Longmont near Table Top Mountain. The route proceeds <br />directly east along Vertnillion Road in Boulder County and Weld County Road (WCR) 32 up to the <br />crossing of Interstate 1-25. At this point the route traverses to the half section line, one half mile <br />north of Highway 66, and proceeds east to a point just west of the South Platte River near <br />Platteville. The route then turns southeast and crosses the South Platte River. The route then <br />follows along WCR 30 for approximately 2 miles to the intersection with WCR 31. The route then <br />turns south and east and proceeds approximately 8 miles to the new water treatment plant site for <br />Fort Lupton and Hudson on Badding's Hill. <br /> <br />The Pipeline will also include various appurtenant facilities. Some of the significant appurtenances <br />include a combination metering and valve facility at the beginning of the Pipeline near Table Top <br />Mountain, an isolation valve located near the Town of Mead, an isolation valve located in the Platte <br />Valley near WCR 19, a turnout valve for the Morgan Pipeline at the intersection of WCR 30 and <br />WCR 31, and a flow control structure for Fort Lupton and Hudson at the same location. Other <br />facilities, such as air-vacuum/air release valves and blow-off valves will be provided along the <br />length of the pipeline. <br />