My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00983
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC00983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:52:30 AM
Creation date
10/6/2006 12:16:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153663
Contractor Name
Hudson, Town of & Hudson Water Fund Entrprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" ,\ <br />\_,.1 <br />...., <br /> <br />, <br />'- ,'} <br /> <br />maintain, repair and replace the Carter Lake to Broomfield Pipeline under the allotment <br />contracts with the participants therein. <br /> <br />d. The SWSP Enterprise agrees to design, construct, complete, operate, maintain, repair and <br />replace the Pipeline in accordance with applicable federal, state and local laws, including, <br />but not limited to, those Colorado statutes which require posting of performance and labor and <br />material bonds and withholding of retainage. <br /> <br />e. Allottee's rights in the Pipeline shall not include: <br /> <br />i. Rights-Of-Way Acquired in Connection with the Pipeline. All rights-Of-way acguired <br />in connection with the Pipeline shall belong to the SWSP Enterprise subject to the <br />obligation of SWSP Enterpri6e to make reimbursement to the Participants for future use <br />of the rights-Of-way as 6et forth herein. Ose of these rightS-Of-way by any <br />Participant for any purpose other than the Pipeline is at the sole discretion of the <br />Board; except that all participants shall have the right to use the Pipeline rights- <br />of-way at no increased cost to connect to the Pipeline and obtain deli very of water <br />at their respective points of delivery described in Schedule A (or any changed point <br />of delivery), and to cross the Pipeline rights-Of-way with their own utility lines so <br />long as such utility lines do not unreasonably interfere with the operation, <br />maintenance and replacement of the Pipeline. This provision shall not in any way <br />affect the exercise by any participant of its rights in its own property that may be <br />crossed by the rights-of-w~y acquired in connection with the Pipeline. Except as <br />provided above, all Entitie6 shall be reguired to pay the Participants for use of the <br />rightS-Of-way in an amount equal to the greater of a) the appraised value of the right <br />to so use the Pipeline rights-of-way at that time or b) one-half of the actual cost <br />of acguisition of the permanent Pipeline rights-Of-way plus all carrying costs <br />including interest at nine percent (9%) from the date of acguisition of the rights-of- <br />way through the date of conveyance. The payment shall be divided among the <br />Participants based upon their contributions to the original cost of the Pipeline <br />rights-Of-way determined on a SegIlent-by-Segment basis as established' in the <br />percentages set forth on Schedule B-3. <br /> <br />ii. Hydroelectric Power PotenWl. The SWSP Enterprise shall own all rights to generate <br />hydroelectric power at any location along the Pipeline; provided, however, that <br />generation of hydroelectric power shall in no way interfere with the delivery of water <br />to the Allottee. The participants shall have the right to participate in the <br />construction, operation and maintenance of any hydroelectric power generating <br />facilities along the Pipeline by the SWSP Enterprise, and to the extent they do, they <br />shall be entitled to receive revenues generated thereby, but Allottee shall otherwise <br />have no obligation to pay any part of the cost of construction, operation or <br />maintenance of any such facilities. Allottee shall own all rights to generate <br />hydroelectric power at locations along Allottee's pipelines which are connected to but <br />not part of the Pipeline. Allottee shall not construct pipelines, hydroelectric power <br />generating facilities, or any other facilities which are hydraulically connected to <br />the Pipeline without first obtaining prior technical approval for such facilities in <br />writing from the SWSP Enterprise to ensure that such facilities do not interfere with <br />the hydraulic characteristics or operations of the Pipeline, or otherwise potentially <br />damage the Pipeline. Should the Allottee's generation of hydroelectric power orioperation of any other facilities which are hydraulically connected to the Pipeline <br />interfere with the intended operation of the Pipeline, Allottee shall cease operation <br />of those facilities upon receiving written notification of interference by the SWSP <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.