Laserfiche WebLink
<br />< <br /> <br />c:\ <br />I'. '1 <br />. .' <br /> <br />, <br />, , <br /> <br />statutes, as amended, which owns and controls the SWSP Enterprise. <br /> <br />e. 'District water' shall mean all water that accrues to the use of the District or its allottees <br />by reason of the Colorado-Big Thompson Reclamation Project. <br /> <br />f. 'Entity' shall mean any quasi-municipal corporation, limited liability company, municipal <br />corporation, public corporation, joint venture, partnership, person, mutual ditch company, <br />water users' association or private corporation. <br /> <br />g. 'Fiscal Year' shall mean the fiscal year of the SWSP Enterprise. Currently, the fiscal year <br />of the SWSP Enterprise begins on October 1 and ends on September 30 of the following calendar <br />year. However, the SWSP Enterprise may change the Fiscal Year during the term of this <br />Contract. <br /> <br />h. 'GPD' shall mean gallons of water per day measured over a 24-hour period beginning at 12:00 <br />a.m. and terminating at 12:00 a.m. on the next day. <br /> <br />i. 'Initial Participants' shall mean the Allottee and any other Entity with an enforceable <br />contract for an allocation of capacity in the Pipeline executed on or before September 1, 1995. <br />Attached hereto as Schedule A and incorporated herein by this reference is a list of all <br />Initial Participants in the Pipeline, their respective initial allotted capacities in GPD, <br />their respective initial points of delivery from the Pipeline and the minimum hydraulic <br />elevation at such delivery points. <br /> <br />j. 'Participant' shall mean the Allottee and any other Entity with an enforceable contract for <br />an allocation of capacity in the pipeline which Entities may change from time to time as <br />permitted hereunder. <br /> <br />k. 'Pipeline' shall mean the Fort Lupton/Hudson Pipeline that has been designed, bid and pursuant <br />to the terms of this Contract, constructed by the SWSP Enterprise, as generally described <br />on Exhibit 1 attached hereto and i~corporated herein by this reference. The Pipeline is <br />specifically described in the Specifications entitled Southern Water Supply Project, Fort <br />Lupton/Hudson and Louisville/Superior Pipelines, dated Hay 1995, and the Drawings entitled <br />Southern Water Supply Project, Fort ~upton/Hudson Pipeline, dated May 1995, both prepared by <br />Black & Veatch, including all change orders thereto processed pursuant to the construction <br />contracts, such Drawings and Specifications being incorporated herein by this reference. <br /> <br />1. 'Segnent' shall mean an individual segnent of the Pipeline for which the design capacity is <br />constant. The Pipeline is divided into two segments. Attached hereto and incorporated herein <br />by this reference as Schedule B is a description of each segnent, including a description of <br />the point of beginning and point of termination of each segment and a cost allocation within <br />each segnent and the allotted capacity in cubic feet per second in each segnent for each <br />Initial Participant. <br /> <br />m. 'Subdistrict' shall mean the Municipal Subdistrict, Northern Colorado Water Conservancy <br />District, a political subdivision of the State of Colorado, and a body corporate with all the <br />powers of a public or municipal corporation, organized and existing by virtue of Title 37, <br />Article 45, Colorado Revised Statute$, as amended. <br /> <br />n. 'Subdistrict water' shall mean the quantity of water acquired and obtained by the Subdistrict <br />from the development and construction of the Windy Gap Project pursuant to applicable state <br />law, and which is deliverable to subdistrict allottees. <br /> <br />2 <br />