Laserfiche WebLink
<br />OPINION OF FEASIBILITY <br /> <br />The excavation of sediment deposits and lake bottom soils to increase the existing storage capacity of <br />the reservoir is technical feasible. The project is also economically feasible because the cost to remove <br />the soils from the lake bottom will be minimized by hauling the material to a property adjacent to the <br />lake. <br /> <br />Feasibility Study <br />Kern Reservoir Enlargement <br /> <br />.7- <br /> <br />August 2002 <br />J:\0636_142\WindsorLeke FS doc <br />