Laserfiche WebLink
<br />=tlile <br /> <br />Mr. Wayne Miller, President <br />August 6, 2002 <br />Page 3 <br /> <br />spillway alterations; water rights assistance; water quality evaluations; wetlands mitigation; or <br />assistance in contracting a construction firm to excavate the reservoir and construct the liner. <br /> <br />SCHEDULE <br /> <br />We understand the project may begin in the very near future. Based upon receiving a notice-to-proceed <br />by the end of July 2002, we anticipate having draft plans and specifications for the slope liner prepared <br />by the end of August and final plans and specifications ready by mid-September, Construction <br />engineering services will be provided as needed during the first season of slope liner construction, with <br />the construction report prepared at the completion of slope liner construction. <br /> <br />Enclosed are two copies of our standard Professional Services Agreement. 1fthis proposal meets with <br />your approval, please sign both copies and return one for our files. <br /> <br />Please call if you have any questions or comments. <br /> <br />Sincerely, <br /> <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br /> <br />Colby J. Hayden, P.E. <br />Project Engineer <br /> <br />CJH:sp <br /> <br />Enclosures <br /> <br />J: \0636 _142\WindsorLakc.pro.doc <br />