Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />capa~ity anti to pr"wmt any annitional ."'Wae" Th" r"."TVoir i. al.o lItiliz",j hy th" nr"e]"y <br />Nnmhp'T 7 OitC"h1 H~ :::in p..qJHl117p.T ~nrnp: of thp. work to hp: clonp.: will inr:Tp.:::tI':.p: thp: p:ffi~ip:nC"y ofthf': <br /> <br />rp.:~f':rvnir H~ ::In P.ql1H li7P:T, :11~n <br /> <br />Water Right: Anjllni~at"n to .tor" 7R,40R,OOO ellhie f""t ofwat"r. <br />Average water diverted per year: _lilllO_ acre-feet. <br />6. Will the acquisition of additional water rights be necessary? YES _ NO -XX <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAMF AnnRFSS ann l'HONF <br />Engineer: Rocky Mountain Consultants, Inc. 1900 South Sunset, Suite l-F, Longmont, CO 80501 <br />Phone: 303-772-5282 <br /> <br />Attorney: Kenneth F. Lind, Esq. 1011 11th Avenue, Greeley, CO 80631 <br /> <br />Phone: 970-353-2323 <br /> <br />List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br /> <br />A f"a.ihility .hlny ann inv".tigiltion i. in th" pme".. ann will h" eompl"tp.cl hy A nIP,.t 70 7001 <br /> <br />9. Estimated cost of the project. <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: <br /> <br />Estimated Construction Costs: <br /> <br />Estimated Total Costs: <br /> <br />Please include estimated engineering costs, and estimated <br /> <br />$ <br />$ <br /> <br />100,00000 <br />, 000 000 00 <br />. <br /> <br />$,10000000 <br />, <br /> <br />Tot Holning may pay th,,;r 10% np front <br /> <br />l"aving a total1oan amount of<j;1,OfiOOOO 00 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />1,000,000 00 <br />($2,295,000.00 total) <br />;, 10 y"ar. <br />17<;% <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />(Usually 10,20, or 30 years) <br /> <br />(Please call for OUf current rates) <br /> <br />r' <br /> <br />"\ <br /> <br />CFlA602 <br />