My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150112 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150112 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:26:07 AM
Creation date
10/6/2006 12:15:59 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150112
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C{501l2 ~ C t50//8 . <br />~ <br />.;:::;:::= <br /> <br />FEASIBILITY STUDY <br /> <br />KERN RESERVOIR ENLARGEMENT <br /> <br />SPONSORED BY THE KERN RESERVOIR AND DITCH COMPANY <br />IN CONJUNCTION WITH THE COLORADO WATER CONSERVATION BOARD <br /> <br />Prepared by: <br /> <br />HALL-IRWIN CONSTRUCTION <br />3026 4th Avenue <br />Greeley, Colorado 80631 <br /> <br />ROCKY MOUNT AlN CONSULTANTS, INC. <br />1900 South Sunset Street, Suite 1-F <br />Longmont, Colorado 80501 <br /> <br />August 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.