Laserfiche WebLink
<br />~,...,.. <br />y;t-1;f;.r"" <br />;~';"~;t> <br /> <br />. <br /> <br />. <br /> <br />the items of work have increased significantly. The cost ,)f riprap has increased nearly 60%, the cost of <br />the gates. operators. and the concrete pipe have increased approximately 25% since the costs estimates <br />were conducted, The cost to complete basic tasks such as earthwork excavation and fill have increased <br />on the order of 100% since 1996, The 10% contingency fee utilized in the study was not adequate to <br />address this type of increase in costs, <br /> <br />"" <br />~., . . <br />" ..' Due to the unforseen problems noted, the project cost has changed significantly. Due to this. the Woods <br />Lake Mutual Water and Irrigation Company requests the CWCB Board increase the loan amount by <br />$270,000, <br /> <br />If you have any questions. please contact Mr, Ruben Hergert. President of Woods Lake or Duane Smith <br />of Smith Geotechnical. <br /> <br />'""""...t';.;. <br /> <br />Prepared by, <br />SMITH GEOTECHNICAL <br /> <br />R.:viewed and Approved by. <br />Woods Lake Mutual Water & Irrigation Company <br /> <br /> <br />(ff~ I!~ <br /> <br />Ruben Hergert, President <br /> <br />w/anacbments <br /> <br />Woods Lake Dam <br /> <br />Page 4 <br /> <br />, <br /> <br />l <br /> <br />e <br /> <br />. <br /> <br />e <br />