Laserfiche WebLink
<br />, <br /> <br />~'~'" <br />.,.~; .I' <br />,-.;'" <br />., <br /> <br />e <br /> <br />;::-:~ ~:r;-; . <br /> <br />.~["', ",.J: . <br /> <br />e <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />WOODS LAKE MUTUAL WATER & IRRIGATION COMPANY <br />12315 Weld County Road 72 <br />Eaton, Colorado 80615 <br /> <br />January 12, 1999 <br />Project No. 96.013 <br /> <br />Mr, Mike Serlet, P.E. <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, CO 8OZ03 <br /> <br />Dear Mr. Serlet: <br /> <br />The design of the Woods Lake Dam Rehabilitation has been completed by our engineer. Smith <br />Geotechnical. We have revised the estimated cost to complete the work as follows. <br /> <br />Estimated Consb'uction Celsts <br />10% Contingency <br />EngineerinstSurveying <br />New Irrigation Pump Structure <br />TOTAL <br /> <br />$ 400,774 <br />$ 40,077 <br />$ 55,000 <br />$ 53,970 <br />$ 549,821 <br /> <br />See the attached table for a breakdown of the esti~ed construction costs, The revised construction costs <br />are due to changeS required by the State Engineer mat were unknown when the project started and due to <br />relocation of the spillway. 'The revised engineering and surveying costs are based on changes to date due <br />to revisions required to the spillway and outlet works and additional surveying due to relocation of the <br />spillway. The "New Inigation Pump Structure" is to relocate the current irrigation pump stnlcture located <br />in the dam to a location removed from the dam at the request of the State Engineer. A more detailed <br />explanation of the changes is summarized later in this letter, <br /> <br />A sUIllllWy of the costs as outlined in the "Feasibility SlIIdy" dated January 24, 1997 and the current cost <br />projections is as follows. <br /> <br />SUMMARY OF PROJECT COSTS <br /> <br />Item . .' 'WiktCOSI ~tinWe Current Cost Estimate <br /> Ian' 1997 1 anuary 1999 <br />Estimated Constnlction Cost $194,000 $454,744 <br />Engineering/Surveying $ 36,000 $ 55,000 <br />Contingency $ 20,000 $ 40.077 <br />TOTAL $250,000 $549,821 <br /> <br />Woods L8ke Dam <br /> <br />Page 1 <br /> <br />= ""- -----"- <br />