My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Contract
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C153629 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:19 AM
Creation date
10/6/2006 12:15:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. ' <br /> <br />.,... <br />..1....;.:1 <br />.. I <br /> <br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering agreement <br />between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board staff <br />(plans and specifications for storage dams and reservoirs <br />must also be approved by State Engineer's Office). <br /> <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. Project sponsor may issue the notice of award and the notice <br />to proceed with construction to the contractor (both notices <br />must be approved by the Board staff before they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br /> <br />construction s~hedule by Board staff. <br /> <br />7. construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must be <br />approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency items <br />cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has been <br />completed according to approved drawings and specifications <br />and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built project by Board <br />staff. <br /> <br />10. Submittal of as-built drawings to Board staff for approval <br />and filing. <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.