My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150044 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150044 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:10:06 AM
Creation date
10/6/2006 12:15:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150044
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
HB 00-1419
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A more specific cost break down is as follows: <br /> <br />l..t..ern <br /> <br />1. De-Watering (lump sum) <br />2. Remove Existing Structure (lump sum) <br />3. Earthwork (lump sum) <br />4. Sheet Piling (3800 square feet) <br />5. Pipe Piling (840 linear feet) <br />6. Obermeyer Bladder Gate (lump sum) <br />7. Radial Gate (lump sum) <br />8. Concrete (I50 cubic yards) <br />9. Reinforcing Steel (27000 pounds) <br />10. Contingency <br />11. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Implementation Schedule <br /> <br />Estimated Cost <br /> <br />$ 18,000 <br />$ 15,600 <br />$ 16,000 <br />$ 69,700 <br />$ 14,300 <br />$165,000 <br />$ 13,000 <br />$ 43,200 <br />$ 14,400 <br />$ 66,500 <br />S 14.300 <br /> <br />$450,000 <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Lla!< <br />1. Complete Final Design <br />2. Order Pneumatic Structure <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />~ <br />09/01/00 <br />10/15/00 <br />12/01/00 <br />02/01/01 <br />02/15/01 <br /> <br />Although shareholders in the RRLC will be impacted with increased <br />assessments for construction and loan repayment, the project will <br />have a long term positive economic impact by assuring annual <br />diversion of approximately 111,000 acre feet of water for <br />irrigation and as indicated on page 6 under alternative 1, the <br />reverse of this situation is ~ acceptable to the Company. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The new diversion structure will occupy <br />the same area as what exists now and will be about the same size <br />and shape. <br /> <br />feouibll1tyStudy <br />Riveor"ld~ R~..nVOlr and <br />Laml CO<T1pany Div~r.lon Structure <br />FebI'\Jary2000 <br /> <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.