Laserfiche WebLink
<br />SeCTION 5 - SCHEDULE OF EXISTING DEBT <br />The BORROWER has no existing debt. <br />SecTIoN 6 - COLLATERAL <br />The collateral provided for this loan. as evidenced by the executed Deed of Trust, <br />attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100%) interest in the Riverside Ditch and Allen Extension. as <br />more particularly described in the attached Deed of Trust ("Collateral"). The initial <br />deed of trust shall identify the LOAN AMOUNT. If the amount of loan funds disbursed <br />by the CWCB to the BORROWER differs from the LOAN AMOUNT. the Deed of Trust <br />shall be amended. <br />SECTION 7 - ADDITIONAL CONTRACT REQUIREMENTS <br />No additional contract requirements imposed by the CWCB for this loan. <br />SeCTION 8 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer. registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by tlie CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs. as defined by <br />937-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bidding and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms. which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract. <br />performance bond. payment bond, notice of award. notice to proceed. sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract. the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction. the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />/. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br /> <br />Page 2 of 3 <br />