My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00816
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC00816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
10/6/2006 12:14:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />selected by the BORROWER and found acceptable by the CWCB staff before work under this <br />contract begins.. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the advertisement for bid, contractor's proposal, construction contract, bid bond, <br />performance bond, payment bond, notice of award, notice to proceed, sample change order, <br />and sample field order. After the CWCB staff verifies that these documents comply with the <br />terms of this contract, the BORROWER may issue the notice to proceed to the CONSTRUCTION <br />FIRMS. <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff <br />shall have the opportunity to review and approve the construction schedule. <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the <br />CWCB staff. <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings <br />of the PROJECT to the CWCB staff, and, if required by 9 37-87-105, C.R.S. (1997), the <br />BORROWER shall provide the same drawings to the State Engineer's Office for approval and <br />filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection <br />for the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT. <br /> <br />As of the date of this contract, the BORROWER has completed steps a. through g. above to the <br />STATE'S satisfaction. <br /> <br />2. Time for PROJECT completion. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall complete <br />the PROJECT within three (3) years of the date of this contract. The time for completion of the <br />PROJECT may be extended subject to the approval of the STATE. The BORROWER must provide, <br />in writing, documented justification for any request for an extension within sixty (60) days prior to <br />the end of the periOd for completion. The STATE will provide to the BORROWER within thirty (30) <br />dllYS following receipt of the BORROWER'S request, a letter of approval or denial of the request for <br />extension of time for completion. <br /> <br />3. Indemnification By The CONSTRUCTION FIRM. The BORROWER shall require all CONSTRUCTION <br />FIRMS and their subcontractors to indemnify the STATE and the BORROWER against all liability and <br />loss, and against all claims and actions based upon or arising out of damage or injury, including <br />death, to persons or property, caused by any acts or omissions of those parties or sustained in <br />connection with the performance of any contract related to the PROJECT or by conditions created <br />thereby, or based upon any violation of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />4. Liability Insurance During Construction. The BORROWER shall require the CONSTRUCTION <br />FIRM and its subcontractors to maintain, during the term of their contracts for construction of the <br />PROJECT, the following insurance with a company that is satisfactory to the STATE: <br /> <br />a. Worker's compensation and employer'S liability insurance in the required statutory amounts. <br /> <br />Ute Water Activity Enterprise and <br />Ute Water Conservancy District <br /> <br />Page 301 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.