My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150143 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150143 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:38:07 AM
Creation date
10/6/2006 12:13:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150143
Contractor Name
Willow Heights Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROMISSORY NOTE <br /> <br />Date: August 1, 2003 <br />Borrower: Willow Heights Irrigation Company <br />Principal Amount: S 104,535 <br />Interest Rate: 3.75% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150143. dated August 1, 2003 <br /> <br />Loan Payment: $5,863.12 <br />A;J~d /. <br />fl~. __, f I, <br />.rf > <br />These two fields are filled in after the project has been substantially completed. <br /> <br />Maturity Dale-; <br /> <br />;l.MY <br />20:3 ) <br /> <br />Payment Initiation Date*: <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ("eWeS"), the Principal Amount plus Interest for the Term of Repayment. pursuant to <br />the LOAN CONTR.A.CT and this Promissory Note. <br />2. Principal and interest shalf be payable in equal Loan Payments, with the first payment due and <br />payable one year from the date the ewes determines that the project is substantially <br />complete (Payment Initiation Date), and annually thereafter until all principal, interest, and late <br />charges, if any, have been paid in full, with all such principal, interest, and late charges, <br />required to be paid on or before the Maturity Date. <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street. <br />Room 721, Denver, Colorado 80203. <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the <br />CWCS does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />7. This Note is issued pursuant 10 the LOAN CONTRACT between the CWCS and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are <br />evidenced by a Security Agreement(s), Deed(s) of Trust, and/or Assignment(s) of even date <br />and amount and cover certain revenues, real property, water rights and/or accounts of the <br />BORROWER. The LOAN CONTRACT, Security Agreement, Deed of Trust, and/or Assignment <br />grant additional rights to the CWCB, including the right to accelerate the maturity of this Note <br />in certain events. <br /> <br />Appendix 2 to Loan Contract C150143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.