Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />r <br /> <br />, <br /> <br />APPLICATIO~ 1"OR S'l'ATE WATER PkOJECT <br /> <br />RECEIVED '. <br /> <br />TO: Colorado Water Conservation Boar~ <br />102 Columbine Building <br />1845 Sherman street <br />Denver, Colorado 80203 <br /> <br />DEe 101973' <br /> <br />. <br /> <br />COLO. WATER <br />CONSERVATION BOARD <br /> <br />.i <br /> <br />1. Name of Applicant(s) (sponsor (5)): City of Rifle <br /> <br />Mailing Address:' P.. O. Box 609 <br /> <br />Rifle. Co'or~do 81650 <br /> <br />Telephone Number: (303) 625-2121 <br /> <br />2. Briefly describe the purPose,' lOcation'and'need for the project: <br /> <br />This project will provide for the construction of a new raw water intake works' <br />and raw ~ater pump station for the City of Rifle. The location is located <br />adjacent to the north bank of the ColoY'ado River and approximately in the center <br />of Section 1-7, Township 6 South, Ranqe 93' West of the 6th'P~M. .: . <br /> <br />The purpose of the new pumping station is to provide for ~nlargedpumpinq. <br />capacity and also provide for improved efficiency in pumping. .A settlinq pond <br />is planned as part.of the project which will result in improved operating and' <br />maintenance costs. : <br /> <br />The present pumping station', as described in the enclosed report, is operating <br />. at near capacity during .the high use season. Enlargement of the existing . <br />facility is impractical due to land and topographic considerations. Additional <br />raw water must be made'available i,n order to provide for the needs of the <br />present and future citizens of Rifle. . <br /> <br />,", <br /> <br />I' <br /> <br />'. <br /> <br />, . <br /> <br />" <br /> <br />. <br /> <br />. '\ <br /> <br />. ';'.' <br />