Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br /> <br />ROUTING NUMBER: 0 I 03 7 <br /> <br />$143,000 <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this ~-!J day of ALJ[t)f71,e~ 1997, by <br />and between the State of Colorado for the use and benefit of the Department of Natural <br />Resources, Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, <br />and The Hawkeye Lateral Ditch Company, a Colorado nonprofit corporation, 1298 18 1/2 <br />Road, Fruita, CO 81521, hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YYYY, Appropriation L97, GBL HAWK, Program WTRC, Object Code <br />5120, Reporting Category: 3796, Contract Encumbrance Number C153796. <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. Pursuant to the provisions of ~~ 37-60-119 and 37-60-120,15 C.R.S. (1990 and Supp. 1996) the <br />STATE is authorized to loan money for the construction of water projects for the benefit of th3 <br />people of the STATE, provided that the borrower assures repayment of that money. <br /> <br />4. The BORROWER is a duly constituted Colorado nonprofit corporation located in Mesa County, <br />State of Colorado. <br /> <br />5. The BORROWER applied to the STATE for a loan to be used to finance the rehabilitation of its ditch <br />by placing the existing concrete ditch in an underground pipe, hereinafter referred to as PROJECT, <br />at an estimated total cost of $ 393,000. <br /> <br />6. The STATE has reviewed a feasibility report prepared by the U.S. Natural Resources Conservation <br />Service (Grand Junction office), which is incorporated herein by reference, and, based upon this <br />feasibility report, the STATE determined the PROJECT to be technically and financially feasible. <br /> <br />7. At its November 1996 meeting, the CWCB approved a loan to the BORROWER in an amount of up <br />to $143,000 (not to exceed 75% of the costs of the PROJECT) at an interest rate of 3.75% per <br />annum for a term of thirty years. <br /> <br />8. Pursuant to 1997 Colo. Sess. Laws, Ch. 168, Section 1(1)(g), the General Assembly authorized <br />the CWCB to loan to the BORROWER an amount not to exceed $143,000 to finance the costs of <br />the PROJECT. / <br /> <br />9. The STATE now desires, by this contract, to ioan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions. <br /> <br />The Hawkeye Lateral Ditch Company <br /> <br />Page 1 of 13 <br /> <br />Loan Contract <br />