Laserfiche WebLink
<br />of 3.75% per annum for a duration of 30 years. <br /> <br />9. Pursuant to SB99-173, Section 1, the Colorado General Assembly authorized the CWCB to <br />loan to the BORROWER an amount of $1 ,250,000 for the PROJECT. <br /> <br />10. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT <br />upon mutually agreeable terms and conditions. <br /> <br />THEREFORE, in consideration of tl1e mutual and dependent covenants contained <br />herein, the parties agree as follows: <br /> <br />A. The BORROWER agrees as follows: <br /> <br />1. Construction Fund Program Procedu(es. The following items are procedures the <br />BORROWER shall follow during the construction phase of the PROJECT. <br /> <br />a. The BORROWER shall employ an erlgineer, registered in the State of Colorado, <br />hereinafter referred to as the CONSUL rANT, to prepare plans and specifications for the <br />PROJECT. <br /> <br />b. The agreement between the BORROWER and the CONSULTANT and the plans and <br />specifications must be submitted to thp CWCB staff for verification of compliance with <br />the terms of this contract prior to bid opening. Any modifications to the plans and <br />specifications must be approved in writi"9 by the CWCB staff. <br /> <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by S 37- <br />87-105 C.RS. (1997), the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br /> <br />d. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and <br />capable firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION <br />FIRMS shall be selected by the BORROWER and found acceptable by the CWCB staff <br />before work under this contract begins. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the advertisement for bid, contractor's proposal, construction contract, bid <br />bond, performance bond, payment bood, notice of award, notice to proceed, sample <br />change order, and sample field order. After the CWCB staff verifies that these <br />documents comply with the terms of this contract, the BORROWER may issue the notice to <br />proceed to the CONSTRUCTION FIRMS. <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB <br />staff shall have the opportunity to review and approve the construction schedule. <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall emplOY an inspector who has been approved by the <br />CWCB staff. <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> <br />Leroux Creek Water Users' Association <br /> <br />Page 2 of 13 <br /> <br />Loan Contract <br />