My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00667
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:10:44 AM
Creation date
10/6/2006 12:12:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153669
Contractor Name
Windsor Reservoir and Canal Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
EIA
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:,-, <br /> <br />.:) <br /> <br />LOAN CllIITRACT <br />Yindsor Reservoir and CanaL Co. <br />_rgency Loan <br /> <br />~------_._----_._---------_.---_.-- <br /> <br />12. (Adhere to applicable laws): Shall strictly adhere to all applicable Federal, <br />State, and local laws and regulations that have been or may hereafter be established. <br /> <br />------------------------------------------------------------------------------------------------------------------ <br /> <br />C. The State agrees that it has or shall: <br /> <br />1. (Agree to loan money to the Borrower to cover eligible project construction <br />costs): Agree to loan to the Borrower an amount not to exceed that specified in the <br />Promissory Note of this contract. Said amount shall be made available to the Borrower <br />in accordance with the following terms and conditions: <br /> <br />1a. The Borrower shall prepare, with the assistance of the Consultant referred to <br />in paragraph A.1. above, a statement of the costs of project construction and shall <br />forward satd statement to the State. <br /> <br />lb. Upon receipt and approval by the State of such statement, the State will, <br />within thirty (30) days from the approval of such statement, pay over to the Borrower <br />the amount of the statement or such portion thereof as has been approved by the State. <br /> <br />.1c. Project construction costs eligible for financing by the State shall be limited to <br />the cost of: <br /> <br />(1) Preparing final designs and specifications for the project. <br /> <br />(2) Preparing bid and construction contract documents. <br /> <br />(3) Preparing environmental assessment or environmental impact <br />statements, and otherwise complying with the Federal National <br />Environmental Policy Act. <br /> <br />(4) Complying with all Federal, State, and local regulatory requirements, <br />including the obtaining of all required permits. <br /> <br />(5) Land and water rights acquisitions needed for the project, including <br />the necessary appraisals and evaluations. <br /> <br />(6) Fish and wildlife mitigation measures required by Federal, State, or <br />local laws and regulations. <br /> <br />(7) Actual construction as called for in the design documents and in <br /> <br />Page ~ of 13 Pages <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.