Laserfiche WebLink
<br />John Pemulis & Sons Partnership <br />May 23. 2002 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB DesiQn and Construction Administration Procedures. Tim <br />Feehan will contacted you regarding the CWCB requirements concerning project bidding, <br />design, and construction. Tim will make construction inspections, which will be the basis of the <br />monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a SmaU Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />S;ja4 <br /> <br />Mike Serlet, PE. Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Peroulls502memo <br /> <br />cc (wlAttachment 1.): <br /> <br />Mr. David Smith, Board Member, Colorado Water Conservation Board <br />Brian Len, p.e.. Northwest Colorado Consultants. P.O. Box 775226. Steamboat Springs. CO 80477 <br />CWCB Section B Staff <br />Linda BassI, A.GO <br />Chrono File <br /> <br />C: wp51\Proj-NewlPerouiis502Itr <br />