My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150155 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:38 AM
Creation date
10/6/2006 12:12:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />G]B <br /> <br />GORDON ]. <br /> <br />B OSA <br /> <br />ATTORNEY-AT-LAW <br />P.O. BOX 58, ALAMOSA, COLORADO 8110! (719) 589-6603 FAX: (719) 589-3186 E-MAIL: Gordwa@aol.com <br /> <br />November 5, 2003 <br /> <br />The Colorado Water Conservation Board <br />Department of Natural Resources <br />1580 Logan street, ste 750 <br />Denver, CO 80203 <br /> <br />The Board of Directors <br />The Rio Grande and Piedro Valley Ditch Company <br />270 County Road 14A <br />DeI Norte, Colorado 81132 <br /> <br />RE: Loan Contract number C-150155 <br /> <br />Ladies and Gentlemen: <br /> <br />I have been specially retained by the Rio Grande and <br />Valley Ditch Company (the "Ditch Company") to render a <br />opinion letter which follows. <br /> <br />Piedro <br />formal <br /> <br />In connection therewith, I have reviewed the Articles of <br />Incorporation and Bylaws of the Ditch Company as well as the <br />resolutions pertaining to the above-referenced matter. Based on <br />that review, my opinion is as follows: <br /> <br />1. The contract for the above-referenced loan has been <br />dually executed by the officers of the ritch Company, who <br />are dUly elected or appointed and are authorized to <br />execute the contract and combine the Ditch Company. <br />Further, the resolution's of the Ditch Company <br />authorizing the execution and delivery of the contract <br />were duly adopted by the Ditch Board of Directors. <br /> <br />2. There are no provisions in the Articles of Incorporation <br />or Bylaws of the Rio Grande and - Piedro Valley Ditch <br />Company or any other state or local law that prevent this <br />contract from binding the Ditch Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.