My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150155 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:38 AM
Creation date
10/6/2006 12:12:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 9 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B, Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits, <br />E, Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and construction <br />management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Loan <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, and <br />local regulatory requirements, <br />SECTION 10- DISBURSEMENT SCHEDULE <br />The BORROWER shall prepare a periodic progress report which contains a statement of <br />the PROJECT costs expended for that period and shall forward said statement to the <br />CWCB. After receipt of the periodic progress report from the BORROWER, and review <br />and acceptance of the items therein as eligible expenses as described below, the <br />CWCB will pay to the BORROWER the amount set forth in the report or such portion that <br />has been approved by the CWCB, Such payment shall be made within thirty (30) days <br />from the CWCB's approval of each progress report, <br />SECTION 11 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this Contract is <br />signed by the State Controller or his designee) <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.