Laserfiche WebLink
<br />'t- <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: DO 0 7/ <br /> <br />Contract Amendment No. 1 <br /> <br />This Amendment, made this 1st day of April 2001, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board, hereinafter referred to as the CWCB or STATE, and Windsor <br />Reservoir and Canal Company, hereinafter referred to as the CONTRACTOR. <br /> <br />Factual Recitals <br /> <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment in Fund Number 424, Appropriation Code 525, Contract Encumbrance <br />Number C153725. <br /> <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br /> <br />C. The STATE and the CONTRACTOR entered into a contract October 23, 1996, Contract <br />Encumbrance Number C153725, hereinafter referred to as ORIGINAL CONTRACT, <br />incorporated herein by reference, wherein the STATE agreed to loan money in the total <br />amount of $1,202,000, and the CONTRACTOR agreed to repay the loan in accordance <br />with the terms of the ORIGINAL CONTRACT. <br /> <br />D. The CONTRACTOR requested an additional $1,155,000 for the Company's rehabilitation <br />program including the replacement of outlet structures on Annex No.8, Elder Reservoir <br />and Windsor Reservoir No.8, hereinafter referred to as the PROJECT. The increase in <br />the loan amount from $1,202,000 to $2,357,000 would provide the CONTRACTOR with <br />funding from the STATE not to exceed 90% of the total PROJECT costs. <br /> <br />E. At its January 26-27, 2000 meeting, the CWCB approved increasing this loan by <br />$1,155,000 for a total loan amount of up to $2,357,000 which may be used to finance <br />up to 90% of the total PROJECT cost. The terms for the $1,155,000 loan amount are an <br />interest rate of 4.00% per annum and a repayment period of thirty years. <br /> <br />A. Pursuant to HBOO-1419, Section 2, the Colorado General Assembly authorized the <br />CWCB to loan to the CONTRACTOR an additional amount not to exceed $1,155,000, <br />hereinafter referred to as the AUTHORIZED LOAN AMOUNT, from the Construction Fund <br />for financing PROJECT costs. <br /> <br />F. The STATE and the CONTRACTOR have agreed to amend this contract to increase the <br />amount of the loan by $1,155,000 for a total loan amount of up to $2,357,000, which <br />may be used to finance up to 90% of the total PROJECT cost. <br /> <br />The Windsor Reservoir and Canal Company <br /> <br />Page 1 of 4 <br /> <br />Amendment No.1 <br />