My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150057 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150057 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:01:08 AM
Creation date
10/6/2006 12:11:32 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150057
Contractor Name
West Rhone Lateral Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(.... <br /> <br />PROJECT SUMMARY <br /> <br />SECTION 1 - BORROWER INFORMATION <br />Name: West Rhone Lateral Ditch Company <br />Address: 2074 I Road <br />Fruita, CO 81521 <br />970-248-0622 <br />fogo@acsol.net <br />Mutual ditch company and a Colorado nonprofit corporation <br /> <br />Phone Number: <br />E-mail address: <br />Type of Entity: <br /> <br />Section 2 - Project Description <br />A. Description of Project: The loan is for rehabilitation of the West Rhone Lateral, <br />which shall consist of construction of a new headgate with concrete intake structure <br />on the south side of the Mainline Canal, just east of Road 21. 6,500 feet of 12-inch <br />plastic pipeline will be laid along Road 21 right-of-way, The new pipeline will tie into <br />the existing 12-inch West Rhone Lateral pipeline 1.25 miles south of the new <br />headgate. Taps will be provided off the new pipeline to deliver water to the <br />shareholders. <br />B. Description of Feasibility Study: Karen Fogelquist, President of the West Rhone <br />Lateral Ditch Company, has completed the Feasibility Study using information <br />provided by Kenny Lang, Louis Hartbauer, and Mark Roskos of the NRCS, Dan <br />Crabtree of the U,S. Bureau of Reclamation also provided technical support. The <br />study includes an assessment of alternatives available for rehabilitation of the West <br />Rhone Lateral. <br /> <br />SECTION 3 - COLLATERAL <br /> <br />Collateral. Part of the security provided for this loan, as evidenced by the executed <br />Assignment of Certificate of Deposit attached as Appendix 5 and incorporated herein, shall <br />be an undivided one hundred percent (100%) interest in a certificate of deposit account <br />established by the BORROWER in the amount of ($4000.00), hereinafter referred to as CD <br />ACCOUNT. The CWCB shall use the funas contained in the CD ACCOUNT for the purpose of <br />paying principal and interest due under this contract not otherwise paid by the BORROWER. <br />Any amount withdrawn by the CWCB for this purpose shall be replenished by the BORROWER <br />within sixty days after such withdrawal. The CWCB shall not disburse any loan funds under <br />this contract until the BORROWER has established the CD ACCOUNT. <br /> <br />SECTION 4 - DISBURSEMENT SCHEDULE <br /> <br />The CWCB shall disburse the full/oan amount to the Borrower in the following increments: <br /> <br />1. 50% of loan amount at award of construction contract <br /> <br />2. 40% at 50% completion of the project as determined by the CWCB staff <br />3. 10% upon substantial completion of the Project as determined by the CWCB staff <br /> <br />Appendix 1 to Loan Contract C150057 <br />
The URL can be used to link to this page
Your browser does not support the video tag.