Laserfiche WebLink
<br />,'"" <br />;.-,'--,.] <br /> <br />operation, and maintenance of the PROJECT with minimum limits of $1,000,000 combined single . <br />limit for each occurrence and $2,000,000 general aggregate, including products/completed <br />operations and personal injury. <br /> <br />Said general liability insurance shall name the CWCB as additional insured. The BORROWER shall <br />provide the CWCB with a certificate of said insurance and an additional insured endorsement, and <br />proof of renewals of said insurance. The CWCB shall not disburse any loan funds without <br />evidence of said insurance coverage. Throughout the life of this contract, the CWCS reserves the <br />right to increase the above amount of insurance. <br /> <br />B. PROJECT PROVISIONS <br /> <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br />BORROWER shall adhere to the following: <br /> <br />a. The BORROWER shall employ an engineer, registered in the state of Colorado to prepare plans <br />and specifications for the PROJECT. <br /> <br />b. The BORROWER'S and the Engineering Consultant's Agreements and the' plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with the <br />terms of this contract when available prior to bidding. Any modifications to the plans and <br />specifications must be approved in writing by the CWCB staff. <br /> <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by S 37-87- <br />105 C.R.S., the BORROWER shall provide a letter of approval from the State Engineer's Office <br />prior to construction. <br /> <br />d. CWCB staff must be present at bidding and must approve the award of the construction <br />contract. <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and capable <br />Construction Firms, which said Construction Firms shall be selected by the BORROWER and <br />found acceptable by the CWCB staff. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the contractor's proposal, construction contract, performance bond, payment <br />bond, notice of award, notice to proceed, sample change order, and sample field order, as <br />well as the advertisement lor bid and bid bond at bidding. After the CWCB staff verilies that <br />these documents comply with the terms of this contract, the BORROWER may issue the notice <br />to proceed to the Construction Firms. <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff <br />shall have the opportunity to review and approve the construction schedule. . <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the CWCB <br />staff . <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings <br />of the PROJECT to the CWCB staff, or, if required by S 37-87-105, C.R.S., the BORROWER shall <br />provide the as-built drawings to the State Engineer's Office for approval and filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a linal inspection <br /> <br />West Rhone Lateral Ditch Company <br /> <br />Page 5 of 11 <br /> <br />Loan Contract <br />