Laserfiche WebLink
<br />r <br /> <br />b. The agreement betwee,!e BORROWER and the CONSULTANT a'the plans and specifications <br />must be submitted to the CWCB staff for verification of compliance with the terms of this contract <br />prior to bid opening, Any modifications to the plans and specifications must be approved in writing <br />by the CWCB staff. <br /> <br />c, For plans and specifications for all jurisdictional dams and reservoirs, as defined by ~ 37-87-105 <br />C.R.S, (1990), the BORROWER shall provide a letter of approval from the State Engineer's Office <br />prior to construction, <br /> <br />d, CWCB staff must be present at bid opening and must approve the award of the construction <br />contract. <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and capable firms, <br />hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be selected by <br />the BORROWER and found acceptable by the CWCB staff before work under this contract begins, <br /> <br />"'"":~"'~, <br /> <br />f, The BORROWER must provide copies of executed construction contra('ido<?um€i;t-;,;; consisting of <br />the advertisement for bid, contractor's proposal, constructioncontract,:.bid borid:~performance <br />.",,_ \ _.._i1 <br />bond, payment bond, notice of award, notice to proceed, sample changeo~d~r, ai:id sample field <br />order, After CWCB staff verifies that these documents cOmply with'the tliliD.SA this contract, <br />BORROWER may issue the notice to proceed to the CONSTRUCTION FIRMS,,,, <~'$p- , <br />\ ,'/ f ....:;..:~.~..i~~~i,!.. .r.1;:v"" <br />g, The BORROWER shall conduct a pre-construction conference'i3f which time the CWCB staff shall <br />have the opportunity to review and approve the c;onstruCti~n schedule, <br /> <br />....:-'. <br /> <br />h, If the CWCB staff determines that the PROJECT requires a resident inspector during construction, <br />the BORROWER shall employ an inspector who has been approved by the CWCB staff, <br /> <br />i, The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications, <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br />the PROJECT to the CWCB staff, <br /> <br />k, Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection for <br />the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT, <br /> <br />2. Time for PROJECT completion. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract, Therefore, the BORROWER shall commence <br />with construction in order to complete the PROJECT no later than one (1) year from the date of this <br />contract. The time for completion of the PROJECT may be extended subject to the approval of the <br />STATE, The BORROWER must provide, in writing, documented justification for any request for an <br />extension within sixty (60) days prior to the end of the period for completion, <br /> <br />3. Indemnification by the CONSTRUCTION FIRM. The BORROWER shall require all CONSTRUCTION FIRMS <br />and their subcontractors to indemnify the STATE and BORROWER against all liability and loss, and <br />against all claims and actions based upon or arising out of damage or injury, including death, to <br />persons or property, caused by any acts or omissions of those parties or sustained in connection with <br />the performance of any contract related to the PROJECT or by conditions created thereby, or based <br />upon any violation of any statute, ordinance, or regulation, and the defense of any such claims or <br /> <br />City of Idaho Springs and <br />City of Idaho Springs, Colorado, Water Enterprise <br /> <br />Page 3 of 14 <br />