My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00554
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:09:09 AM
Creation date
10/6/2006 12:10:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153529
Contractor Name
Ish Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />.. <br /> <br />EXHIBIT D <br /> <br />"'" <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRk~ PROCEDURES <br /> <br />,. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed 'plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office) . <br /> <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />s. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction..- All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change .items can commence. Emergency. <br />i terns cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been comoleted according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final ins?Ection and acceptance of as-built p=oject by <br />Board staff. <br /> <br />10. Submittal of as-built ,drawings to Board staff for <br />approval and til ing . <br /> <br />,EXHIBIT D (Project Contract) <br />(Schedule A) <br /> <br />( <br /> <br />102 <br />sched/( <br />
The URL can be used to link to this page
Your browser does not support the video tag.