My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00554
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:09:09 AM
Creation date
10/6/2006 12:10:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153529
Contractor Name
Ish Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />". <br /> <br />". <br /> <br />. <br /> <br />EXHIBIT B <br /> <br />1908 Riverglen Drive <br />Berthoud, CO 80513 <br />September 24, 1987 <br /> <br />Mr. Nick Ioannides <br />Colorado Water Conservation Board <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203' <br /> <br />RE: Feasibility Report Proposal, <br />Ish Reservoir Company Toe Drain <br /> <br />Oear Mr. Ioannides: <br /> <br />.., <br /> <br />~ r----,"'"I 0 <br />nM l'- c:C: <br /><0 ",< <br />~ C) ...0 <br />..; <0;) <br />= &0 3:z <br />oE <br />Mdl l:\I 0.... <br /><;; <br />~ a.. c:'" <br />0", <br /> LLl -'Ul <br />Mdl CI) oz <br />'-'0 <br />~ u <br /> <br />Enclosed is a proposal from Rocky Mountain Consultants, Inc. for the pre- <br />'paration of a Feasibility Report to accompany the Ish Reservoir Company's appli- <br />cation for funding assistance. The project for which a Colorado Water <br />Conservation Board loan is being requested is the construction of a toe drain <br />along the north dam of Ish Reservoir as required by the State Engineer's Office. <br /> <br />The Board of Oirectors of the Ish Reservoir Company have approved the propo- <br />sal as presented. The Board further agrees to pay for one-half the cost of the <br />.., feasibility report preparation, or $3,000, per the Colorado Water Conservation <br />Board's established procedures. Funds for the feasibility study will be <br />obtained through assessments or, if necessary, borrowed through the Federal Land <br />Bank in Wichita, Kansas, and then repaid through assessment. <br /> <br />We would appreciate your assistance with regard to the feasibility report, <br />and look forward to a mutually beneficial relationship in completing the toe <br />drain project. <br /> <br />Very truly yours, <br /> <br />ISH R~SERVOIR CO. <br />-<i. -d ~ <br />V p_o_<__ ',/ . .J <br />Jane Kino <br />Secretary/Treasurer <br /> <br />Enclosure <br /> <br />EXH!BIT B (Feasibility Report Contract) <br />
The URL can be used to link to this page
Your browser does not support the video tag.