Laserfiche WebLink
<br />. w,... _ "_'~..,. ,., '''~.>I <br /> <br />" <br /> <br />WPB <br /> <br />'--., <br /> <br />}EIBIT B <br /> <br />01;0]'04.[ T OR AGENCY NUMBER <br />''''''-', 34-04-00 <br />CONTRACT ROllTING NUMBER <br />9- <br /> <br />$3,000 <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />THIS CONTRACT. made' tht~-'....A' day of ~~./4 . 198;z... by and belween the' <br />State' of Colnrado for the' use and be'nC'fil of the Departmt:nt or.' Natural Resources <br />(Colorado Water Conservation Board), <br />he'rtinafler rrfe'm:d to a~ the- SIJHe', and '.2 the. Ish Reservoir Company, <br />20700 Weld County Road 15, Johnstown, CO 80534, <br />hue-in:lfler referred to as Ihe' contractor jCon tractor. <br /> <br />WHEREAS. authority exiSh in the Law and Funds have bC'en bud,eled. appropriated and othe-rwise- made <br />.available and a sufficient unencumberC'd balanC(> the-reof remains a\'i'-Yablr for payme-nt in Fund NumbC'1 400 B . <br />G/L Accounl Number 5292X. ClIntracl Encumbrance Numbe-r (Yb~'): lInd <br />ABL Account Number 12920, Org. Unit 77-77-777, <br />WHEREAS. required apprnV".d. c1ear:mce lInd coordinatiun has ban accomplished from and with appropriate <br />.!I1e-ocies: gnd <br />WHgREAS, pursuant to the provisions of section 37-60-119, <br />Colorado Revised statutes; as amended, the State is authorized <br />to construct certain water'projects for the benefit of the <br />peopl'e of the State of Colorado; and <br /> <br />WHEREAS. the Ish Reservoir has made application to the <br />State for the'improvement of its existing facility. such <br />improvement of. the facility is hereinafter sometimes referred <br />to as the project; and <br /> <br />WHEREAS. the Contractor is a reservoir company within the. <br />State of Colorado; <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of improving the facilities of the <br />Ish Reservoir. located in Larimer County. Colorado. in <br />accordance with a proposal for a project feasibility repo=t <br />prepared by the conSUlting engineering firm of Rocky Mountain <br />Consultants. Inc. (the Consultant). and approved by the State. <br />received September 25. 1987. which proposal is attached hereto <br />as EXhibit A and made a part of t.his contract... <br /> <br />2, Ten (10) copies of the final report called for in this <br />contract shall be furnished to the State not later than <br />sixty (60) days after the date of this contract. unless such <br />time is extended by mutual agreement of the parties hereto in <br />writing. <br /> <br />3. As compensation for the services of the Contractor. the <br />State shall pay to the Contractor the sum of Three Thousand <br />Dollars ($3.000) in the manner following: <br /> <br />a, Sixty percent (60\). to wit. gighteen Hundred Dollars <br />($1,600) of the total amount due in two (2) monthly <br />installments of Nine Hundred Dollars ($900) each. <br />commencing twenty (20) days after the ~ate of this contract. <br /> <br />b. The remaining forty percent (40\), to wit, Twelve <br />Hundred Dollars ($1.200) within forty (40) days following <br />receipt and acceptance of the written_report specified in <br />paragraph 2. of this contract. <br /> <br />4. The total~cost of services to be rendered for the <br />Contractor by the Consultant is Six Thousand Dollars ($6.000) <br />and the Contractor shall pay the sum of Three Thousand Dollars <br />($3.000) as agreed to by letter dated September 24. 1967. which <br />is hereby attached and made a part of this contract as Exhibit <br />B; and in no event shall this payment be the liability of the <br />State of Colorado. <br /> <br />EXHIBIT B (Project Contract) <br /> <br />395-53-01-1014 <br /> <br />Pal!r i of~pal!es <br />.'S..-c innrUl'lioll$U/1 rl"versc ur laM pIge.) <br /> <br />4901g <br />