My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00554
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:09:09 AM
Creation date
10/6/2006 12:10:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153529
Contractor Name
Ish Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'- <br /> <br />". <br /> <br />project construction during that month and shall <br />forward said estimate to the State not less than <br />fifteen (15) days prior to the beqinninq of such month. <br /> <br />b, Upon receipt ,and approval by the State of such <br />monthly estimate. the State will. within forty (40) <br />days from the receipt of such estimate. pay over to <br />the Contractor the amount of the monthly estimate or <br />such portion thereof as has been approved by the State. <br /> <br />c. No payments will be made under this contract <br />unless and until the project plans and specifications <br />referred to in paragraph B.l. 'above are approved ~y <br />the State in writinq, <br /> <br />d. Project construction costs eligible for payment by <br />the State shall be limited to the cost of: <br /> <br />(1) Preparing final designs and specifications <br />for the project. ' <br /> <br />(2) Preparing bid and construction contract <br />documents. <br /> <br />(3) Preparing environmental assessment or <br />environmental impact statements. and otherwise <br />complying with the federal' National Environmental <br />Policy ACt. <br /> <br />(4) Complying with all federal. state. and local <br />regulatory requirements. including the Obtaining <br />of all required permits. <br /> <br />(5) Land and water riqhts acquisitions needed for <br />the project. including the necessary appraisalS <br />and evaluations. <br /> <br />(6) Fish and wildlife mitigation measures <br />required by federal. state. or local laws and <br />regulations; <br /> <br />(7) Actual construction as called for in the bid <br />documents and in Change orders approved by the <br />Consultant. the contractor. the Construction Firm. <br />and the State. <br /> <br />(8) Engineering services for construction <br />management. inCluding design and construction <br />management for state-approved Change Orders, <br /> <br />(9) Legal services for: <br /> <br />(a) Reviewing engineering services contracts, <br /> <br />(b) Reviewing this contract, <br /> <br />(c) Reviewing construction contract <br />documents. <br /> <br />(d) Acquiring the land and water rights <br />needed for the project. <br /> <br />./ <br /> <br />(e) Complying with all federal State.'and <br />local regulatory requirements. <br /> <br />Legal services must be approved by the State <br />in writing before they are rendered to be <br />eligible for payment by the State. <br /> <br />Page ~ of 10 Pages <br />) <br />
The URL can be used to link to this page
Your browser does not support the video tag.