Laserfiche WebLink
<br />construction, the BORROWER shall employ an inspector who has been approved by the <br />CWCB staff, <br /> <br />h. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications, <br /> <br />i. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, and, if required by section 37-87-105, C,R.S, <br />(1999), the BORROWER shall provide the same drawings to the State Engineer's Office for <br />approval and filing, <br /> <br />j, Upon completiDn of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT, <br /> <br />2. Time For PROJECT Completion. The BORROWER recognizes that time is of the essence in <br />the performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within two (2) years from the date of this contract, The time for <br />completion of the PROJECT may be extended subject to the approval of the STATE, The <br />BORROWER must provide, in writing, documented justification for any request for extension <br />sixty (60) days prior to the end of the period for completion. The STATE will provide to the <br />BORROWER within thirty (30) days following receipt of the BORROWER'S request, a letter of <br />approval or denial of the request for extension of time for completion, <br /> <br />3. Indemnification By The CONSTRUCTION FIRM, The BORROWER shall require all <br />CONSTRUCTION FIRMS and their subcontractors to indemnify the STATE and the BORROWER <br />against all liability and loss, and against all claims and actions based upon or arising out of <br />damage or injury, including death, to persons or property, caused by any acts or omissions of <br />those parties or sustained in connection with the performance of any contract related to the <br />PROJECT or by conditions created thereby, or based upon any violation of any statute, <br />ordinance, or regulation, and the defense of any such claims or actions. <br /> <br />4. Liability Insurance During Construction, The BORROWER shall require the CONSTRUCTION <br />FIRM and its subcontractors to maintain, during the term of their contracts for construction of <br />the PROJECT, the following insurance with a company that is satisfactory to the STATE: <br /> <br />a, Worker's compensation and employer's liability insurance in the required statutory <br />amounts, <br /> <br />b. Automobile liability insurance which includes coverage for all owned, non-owned and hired <br />vehicles with minimum limits of $1,000,000 combined single limit for bodily injury and <br />property damage, <br /> <br />c, Commercial general liability insurance with minimum limits of $1,000,000 combined single <br />limit for each occurrence and $2,000,000 general aggregate, This insurance coverage <br />shall include products/completed operations and personal injury, <br /> <br />d, Builder's risk insurance for construction in progress for all perils of loss including fire, wind, <br />hail, vandalism, and flood in an amount equal to the amount of the PROJECT construction <br />contract(s), <br /> <br />Said general liability insurance shall name the BORROWER and the STATE as additional <br /> <br />Chilcott Ditch Company <br /> <br />Page 3 of t3 <br />