Laserfiche WebLink
<br />'" t., '. <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT E <br /> <br />Task Schedule <br />SPDSS Groundwater Component - Phase 1 <br />September 9,2002 <br /> <br /> Task Task <br /> Task Description Start(1) End <br />31 Collect Historic Aquifer Configuration Data 11/15/02 1/17/03 <br />32 Collect Historic Aquifer Property Data 11/15/02 1/17103 <br />33 Data Collection Design and Workplan\'<! 1/13/03 2128/03 <br />35 Construction and Testing of Alluvial Wells\5} 3/03/03 9/01/03 <br />36 Construction and Testing of Bedrock Wells\5} 3/03/03 9/01/03 <br />38 Collect Historic Aquifer Water Level Data 11/15/02 1/17/03 <br />42 Analyze and Map Aquifer Configuration Data\'<} 12/02/02 12/29/03 <br />43 Analyze and Map Aquifer Property Data\'<) 12/02/02 12/29103 <br />44 Analyze and Map Aquifer Water Level DatalL! 12/02/02 12/29/03 <br />51 Project Management 11/15/02 12/29/03 <br /> <br />Notes: (1) Starting dates for all Tasks assume contract execution by 11115102. <br />(2) Ending dates for Tasks 33, 42, 43 and 44 are dependant on State review of draft <br />deliverables, assumed to be 3 weeks. <br />(3) Ending dates for Tasks 35 and 36 are dependant on field and weather conditions and <br />assume site access can be obtained within 30 days. <br /> <br />SPDSS Groundwater SOW, Phase 1 <br /> <br />Page 31 <br />