My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153953 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153953 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 10:23:09 AM
Creation date
10/6/2006 12:10:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153953
Contractor Name
Camp Dresser & McKee
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" t., '. <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT E <br /> <br />Task Schedule <br />SPDSS Groundwater Component - Phase 1 <br />September 9,2002 <br /> <br /> Task Task <br /> Task Description Start(1) End <br />31 Collect Historic Aquifer Configuration Data 11/15/02 1/17/03 <br />32 Collect Historic Aquifer Property Data 11/15/02 1/17103 <br />33 Data Collection Design and Workplan\'<! 1/13/03 2128/03 <br />35 Construction and Testing of Alluvial Wells\5} 3/03/03 9/01/03 <br />36 Construction and Testing of Bedrock Wells\5} 3/03/03 9/01/03 <br />38 Collect Historic Aquifer Water Level Data 11/15/02 1/17/03 <br />42 Analyze and Map Aquifer Configuration Data\'<} 12/02/02 12/29/03 <br />43 Analyze and Map Aquifer Property Data\'<) 12/02/02 12/29103 <br />44 Analyze and Map Aquifer Water Level DatalL! 12/02/02 12/29/03 <br />51 Project Management 11/15/02 12/29/03 <br /> <br />Notes: (1) Starting dates for all Tasks assume contract execution by 11115102. <br />(2) Ending dates for Tasks 33, 42, 43 and 44 are dependant on State review of draft <br />deliverables, assumed to be 3 weeks. <br />(3) Ending dates for Tasks 35 and 36 are dependant on field and weather conditions and <br />assume site access can be obtained within 30 days. <br /> <br />SPDSS Groundwater SOW, Phase 1 <br /> <br />Page 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.