Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />geotechnical laboratory reports <br /> <br />- analyzed results of the aquifer performance tests <br /> <br />. All data will be maintained in database format and provided to the State in a format that <br />meets the DSS database standards being developed by another consultant. <br /> <br />. The Report will be provided in draft form for State comment. Following resolution of <br />comments, six paper copies and a CD-ROM containing the TM in both MS-WORD and <br />Adobe Acrobat POF format will be provided as the final deliverable. <br /> <br />Task 36: Construction and Testing of Bedrock Wells <br /> <br />Objective: <br /> <br />The objective of this task is to construct and test I well that will provide hydrogeologic data for <br />the bedrock ground water system in the Denver Basin Region. <br /> <br />Comment: <br /> <br />Preliminary aquifer testing of newly constructed bedrock wells will be performed in this task as a <br />standard course of constructing a well. Aquifer parameters determined at the pumping well are <br />often impacted by well inefficiencies and other factors. Therefore a standard aquifer pumping test <br />(including a pumping well and one or more observation wells) is expected to be performed in <br />subsequent phases of the SPOSS development to provide more refined information on aquifer <br />properties. <br /> <br />Approach: <br /> <br />Task 36.1 Bedrock Well Construction and Testing <br />This Phase I program will including the installation, testing and monitoring of I well up to 400 <br />feet deep, completed in one of the Denver Basin Region bedrock aquifers. This task will <br />commence after the State provides written approval the Field Study Workplan (Task 33). <br /> <br />· Locations for drilling of new wells will be located on public right-of"way and accessible <br />for the duration of the drilling and monitoring. Sites will be selected that do not require <br />significant grading for road construction or drilling. Any access fees will be paid directly <br />by the State. The State will be consulted if drilling cannot be done on public right of ways. <br /> <br />· Approved site locations will be staked in the field and cleared for drilling by a commercial <br />utility locating service. <br /> <br />· The Consultant will apply for monitoring well pennits, and will prepare a bid package <br />consisting of well design, technical specifications, and contract documents for well <br />drilling, sampling, logging, testing, and completion. <br /> <br />. Drilling and well installation will be sub-contracted to a qualified drilling contractor who <br />is licensed for this work in the State of Colorado. Well contractors submitting bids on the <br />work will be required to obtain a performance bond for the well construction work. <br /> <br />SPOSS Groundwater SOW, Phase I <br /> <br />Page 23 <br />